Dates: | 1988-1991 |
Size: | 1,411 Photographs |
Repository: | Chicago Public Library, Harold Washington Library Center, Special Collections, 400 S. State St., Chicago, IL 60605 |
Collection Number: | CPL_HWLC Construction Photographs |
Provenance: | Chicago Public Library purchased a complete set of the negatives from Peter Fish Studios in 1995. |
Access: | No restrictions |
Citation: | When quoting material from this collection the preferred citation is: Chicago Public Library Archives, Harold Washington Library Center Construction Photographs [Box #, Folder #], Special Collections, Chicago Public Library. |
Historical Note
The Harold Washington Library Center opened to the public in October 1991. It was the result of an ambitious international Design/Build competition that aimed to house the Central Library’s collection in one building. The winning team was SEBUS, comprised of Schal Associates Partnership; A. Epstein and Sons International; Hammond Beeby and Babka; and U.S. Equities Realty Inc. Working together, they designed and built a library measuring over 750,000 square feet, with more than 70 miles of shelving, completing it on time and within the budget ($144 million).
Scope and Content
These photographs were taken by Peter Fish Studios between 1988 and 1991 during the construction of the Harold Washington Library Center.
The collection consists of over 1,400 black and white prints taken from the beginning of the project in 1988 until March 14, 1991, seven months before the library officially opened. There are another 400 or so negatives, without prints, taken from March 21, 1991 through May 1, 1991 that have not been identified.
Both interior and exterior shots were taken, and all aspects of the building’s construction are shown, including the erection of steel, the masonry work, the interior heating and air conditioning systems, and the installation of marble finishes and casework. The photographer identified each shot and this information was printed on the front of each photograph; the descriptions listed below are thus taken directly from the photographs.
Arrangement
The photographs are arranged in their original order, namely chronological.
Box and Folder Inventory
Box 1 | Folder 1 | December 7, 1988. Auto, north east corner of site, State & Van Buren |
Box 1 | Folder 2 | December 7, 1988. Looking west from State & Van Buren |
Box 1 | Folder 3 | December 7, 1988. Looking south west from State & Van Buren |
Box 1 | Folder 4 | December 7, 1988. Looking south from State & Van Buren |
Box 1 | Folder 5 | December 7, 1988. Looking north from State & Congress |
Box 1 | Folder 6 | December 7, 1988. Looking north west from State & Congress |
Box 1 | Folder 7 | December 7, 1988. Looking west from State & Congress |
Box 1 | Folder 8 | December 7, 1988. Looking east from Plymouth & Congress |
Box 1 | Folder 9 | December 7, 1988. Looking north east from Plymouth & Congress |
Box 1 | Folder 10 | December 7, 1988. Looking south from mid-section of site, west side |
Box 1 | Folder 11 | December 7, 1988. Looking north east from mid-section of site, west side |
Box 1 | Folder 12 | December 7, 1988. Looking south from Plymouth & Van Buren |
Box 1 | Folder 13 | December 7, 1988. Looking south east from Plymouth & Van Buren |
Box 1 | Folder 14 | December 7, 1988. South half of site from roof of Old Colony Building |
Box 1 | Folder 15 | December 7, 1988. North half of site from roof of Old Colony Building |
Box 1 | Folder 16 | January 5, 1989. Looking south at State & Van Buren |
Box 1 | Folder 17 | January 5, 1989. Looking south west at State & Van Buren |
Box 1 | Folder 18 | January 5, 1989. Looking north from State & Congress |
Box 1 | Folder 19 | January 5, 1989. Looking west from State & Congress |
Box 1 | Folder 20 | January 5, 1989. Looking east from Plymouth & Van Buren |
Box 1 | Folder 21 | January 5, 1989. Looking south from Plymouth & Van Buren |
Box 1 | Folder 22 | January 5, 1989. South half of site |
Box 1 | Folder 23 | January 5, 1989. North half of site |
Box 1 | Folder 24 | January 31, 1989. Looking south at State & Van Buren |
Box 1 | Folder 25 | January 31, 1989. Looking south west at State & Van Buren |
Box 1 | Folder 26 | January 31, 1989. Looking north from State & Congress |
Box 1 | Folder 27 | January 31, 1989. Looking west from State & Congress |
Box 1 | Folder 28 | January 31, 1989. Looking east from Plymouth & Van Buren |
Box 1 | Folder 29 | January 31, 1989. Looking south from Plymouth & Van Buren |
Box 1 | Folder 30 | January 31, 1989. South half of site |
Box 1 | Folder 31 | January 31, 1989. North half of site |
Box 1 | Folder 32 | January 31, 1989. 16” C.I. sewer, east side |
Box 1 | Folder 33 | January 31, 1989. 16” C.I. sewer, east side |
Box 1 | Folder 34 | January 31, 1989. City electric vault, south east corner |
Box 1 | Folder 35 | January 31, 1989. Commonwealth Edison vault, south end |
Box 1 | Folder 36 | March 1, 1989. Looking south |
Box 1 | Folder 37 | March 1, 1989. Looking south east |
Box 1 | Folder 38 | March 1, 1989. Looking west |
Box 1 | Folder 39 | March 1, 1989. Looking south west |
Box 1 | Folder 40 | March 1, 1989. Looking north |
Box 1 | Folder 41 | March 1, 1989. Looking north west |
Box 1 | Folder 42 | March 1, 1989. Looking at south half of site |
Box 1 | Folder 43 | March 1, 1989. Looking at north half of site |
Box 1 | Folder 44 | March 30, 1989. Looking south from north west corner |
Box 1 | Folder 45 | March 30, 1989. Looking south east from north west corner |
Box 1 | Folder 46 | March 30, 1989. Base plate of L column # 64 |
Box 1 | Folder 47 | March 30, 1989. Looking west from north east corner |
Box 1 | Folder 48 | March 30, 1989. Looking south west from north east corner |
Box 1 | Folder 49 | March 30, 1989. Edison vaults |
Box 1 | Folder 50 | March 30, 1989. Looking north from south east corner |
Box 1 | Folder 51 | March 30, 1989. Looking north west from south east corner |
Box 1 | Folder 52 | March 30, 1989. North east corner of job site J-16 |
Box 1 | Folder 53 | March 30, 1989. North half from roof |
Box 1 | Folder 54 | March 30, 1989. South half from roof |
Box 1 | Folder 55 | April 27, 1989. G.V. North half |
Box 1 | Folder 56 | April 27, 1989. G.V. South half |
Box 1 | Folder 57 | April 27, 1989. G.V. Looking south |
Box 1 | Folder 58 | April 27, 1989. G.V. Looking south east |
Box 1 | Folder 59 | April 27, 1989. G.V. Looking west |
Box 1 | Folder 60 | April 27, 1989. G.V. Looking south west |
Box 1 | Folder 61 | April 27, 1989. G.V. Looking north |
Box 1 | Folder 62 | April 27, 1989. G.V. Looking north west |
Box 1 | Folder 63 | April 27, 1989. G.V. Looking north |
Box 1 | Folder 64 | April 27, 1989. G.V. Looking north east |
Box 1 | Folder 65 | May 30, 1989. Looking south |
Box 1 | Folder 66 | May 30, 1989. Looking south |
Box 1 | Folder 67 | May 30, 1989. Looking south east |
Box 1 | Folder 68 | May 30, 1989. Looking west |
Box 1 | Folder 69 | May 30, 1989. Looking south west |
Box 1 | Folder 70 | May 30, 1989. Looking east |
Box 1 | Folder 71 | May 30, 1989. Looking north east |
Box 1 | Folder 72 | May 30, 1989. North half |
Box 1 | Folder 73 | May 30, 1989. South half |
Box 1 | Folder 74 | June 29, 1989. Ground level, looking south west at foundation wall |
Box 1 | Folder 75 | June 29, 1989. Ground level, looking south at foundation wall |
Box 1 | Folder 76 | June 29, 1989. Ground level, looking west at ground floor DN. Col. 16 |
Box 1 | Folder 77 | June 29, 1989. Ground level, looking west at ground floor DN. Col. 13½ |
Box 1 | Folder 78 | June 29, 1989. Ground level, looking south from column M18 |
Box 1 | Folder 79 | June 29, 1989. Ground level, looking south west at ground floor concrete place |
Box 1 | Folder 80 | June 29, 1989. Ground level, looking south at ground floor audit opening |
Box 1 | Folder 81 | June 29, 1989. Ground level, looking south at ground floor concrete place |
Box 1 | Folder 82 | June 29, 1989. Ground level, looking north at column E13, ground floor place |
Box 1 | Folder 83 | June 29, 1989. Ground level, looking east at south end |
Box 1 | Folder 84 | June 29, 1989. Looking east, at north half |
Box 1 | Folder 85 | June 29, 1989. Looking east, at south half |
Box 1 | Folder 86 | July 31, 1989. Ground level, south east corner, north loading dock, looking north |
Box 1 | Folder 87 | July 31, 1989. Ground level, south east corner, center loading dock, looking east |
Box 1 | Folder 88 | July 31, 1989. Ground level, south east corner, north, 4 loading docks, looking north |
Box 1 | Folder 89 | July 31, 1989. Ground level, south east corner, south, loading dock looking south |
Box 1 | Folder 90 | July 31, 1989. Ground level, south east corner, north, ramp, looking north |
Box 1 | Folder 91 | July 31, 1989. Mezzanine level, east elevation wall, looking north |
Box 1 | Folder 92 | July 31, 1989. Ground level, # 6 line columns, looking east |
Box 1 | Folder 93 | July 31, 1989. Ground level, forming column L-2, looking south east |
Box 1 | Folder 94 | July 31, 1989. Ground level, east wall, looking north west |
Box 1 | Folder 95 | July 31, 1989. Ground level, east wall WK platform, looking north |
Box 1 | Folder 96 | July 31, 1989. Ground level, inclined column H-2, looking south |
Box 1 | Folder 97 | July 31, 1989. Ground level, inclined column E-2, looking south east |
Box 1 | Folder 98 | July 31, 1989. Second level, north east corner, form work, looking south |
Box 1 | Folder 99 | July 31, 1989. Second level, north east corner, rebar, looking south west |
Box 1 | Folder 100 | July 31, 1989. Second level, A-frame scaffolding, looking west |
Box 2 | Folder 101 | July 31, 1989. Second level, removing east wall form, looking south west |
Box 2 | Folder 102 | July 31, 1989. Second level, 15-line, looking north east |
Box 2 | Folder 103 | July 31, 1989. Ground level, forming. inclined column E-12, looking south |
Box 2 | Folder 104 | July 31, 1989. G.V. from second level 13, looking south east |
Box 2 | Folder 105 | July 31, 1989. G.V. from second level E12, looking north east |
Box 2 | Folder 106 | July 31, 1989. Ground level access stairway at E-12, looking south |
Box 2 | Folder 107 | July 31, 1989. Lower level G.V. at oculus, looking north |
Box 2 | Folder 108 | July 31, 1989. Lower level, rakers through west wall line 7-8, looking west |
Box 2 | Folders 109-127 | c. August 15, 1989. Unidentified |
Box 2 | Folder 128 | August 30, 1989. Mezzanine level, looking from ground level parking area |
Box 2 | Folder 129 | August 30, 1989. Ground level, external wall on Van Buren |
Box 2 | Folder 130 | August 30, 1989. Auditorium transfer struts as viewed from ground level |
Box 2 | Folder 131 | August 30, 1989. Second level, post tension beams stress end |
Box 2 | Folder 132 | August 30, 1989. Second level, east escalator openings |
Box 2 | Folder 133 | August 30, 1989. Ground level, external wall on State Street |
Box 2 | Folder 134 | August 30, 1989. Under ground 12KVA electrical feeders |
Box 2 | Folder 135 | August 30, 1989. Lower level, electrical contractor stage area |
Box 2 | Folder 136 | August 30, 1989. Red conc. Encasement of Ceco feeders |
Box 2 | Folder 137 | August 30, 1989. Lower level, sprinkler mains |
Box 2 | Folder 138 | August 30, 1989. Underground plumbing installation, south end |
Box 2 | Folder 139 | August 30, 1989. Second level architectural column, looking north east |
Box 2 | Folder 140 | August 30, 1989. Second level as viewed from south west corner |
Box 2 | Folder 141 | August 30, 1989. Third level, post tension beam framework |
Box 2 | Folder 142 | August 30, 1989. Third level, reinforced steel, looking north |
Box 2 | Folder 143 | August 30, 1989. Second level, north wall built up, beam box out |
Box 2 | Folder 144 | August 30, 1989. Third level, slab bulkhead, looking north east |
Box 2 | Folder 145 | August 30, 1989. North west corner elevation |
Box 2 | Folder 146 | August 30, 1989. North east corner |
Box 2 | Folder 147 | August 30, 1989. North half of site |
Box 2 | Folder 148 | August 30, 1989. South half of site |
Box 2 | Folder 149 | August 30, 1989. South west corner |
Box 2 | Folder 150 | August 30, 1989. South east corner |
Box 2 | Folder 151 | September 14, 1989. Ground level, north west corner, mechanical duct work |
Box 2 | Folder 152 | September 14, 1989. Ground level, concrete topping bulkheads |
Box 2 | Folder 153 | September 14, 1989. Lower level, north west mechanical room |
Box 2 | Folder 154 | September 14, 1989. Underground conduit installation |
Box 2 | Folder 155 | September 14, 1989. Fourth level, freight R.O., elevator core wall |
Box 2 | Folder 156 | September 14, 1989. Second level, exterior south wall |
Box 2 | Folder 157 | September 14, 1989. South perimeter wall, built up beam |
Box 2 | Folder 158 | September 14, 1989. Third level, perimeter slab edge |
Box 2 | Folder 159 | September 14, 1989. Architectural column, patch procedure |
Box 2 | Folder 160 | September 14, 1989. Perimeter wall, built up web extension |
Box 2 | Folder 161 | September 14, 1989. Post tension cable |
Box 2 | Folder 162 | September 29, 1989. Ground level, duct work |
Box 2 | Folder 163 | September 29, 1989. Second level, concrete topping |
Box 2 | Folder 164 | September 29, 1989. Concrete cover for underground conduit |
Box 2 | Folder 165 | September 29, 1989. Concrete cover for underground conduit |
Box 2 | Folder 166 | September 29, 1989. Rakers at south wall |
Box 2 | Folder 167 | September 29, 1989. Third level, north wall |
Box 2 | Folder 168 | September 29, 1989. North half of site |
Box 2 | Folder 169 | September 29, 1989. South half of site |
Box 2 | Folder 170 | September 29, 1989. South west corner |
Box 2 | Folder 171 | September 29, 1989. South east corner |
Box 2 | Folder 172 | September 29, 1989. North west corner |
Box 2 | Folder 173 | September 29, 1989. North east corner |
Box 2 | Folder 174 | October 6, 1989. G.V. looking north from roof |
Box 2 | Folder 175 | October 6, 1989. North wall |
Box 2 | Folder 176 | October 6, 1989. Ground level, auditorium |
Box 2 | Folder 177 | October 6, 1989. West elevation |
Box 2 | Folder 178 | October 6, 1989. Waterproof application at dock |
Box 2 | Folder 179 | October 6, 1989. Ground level, storm drain installation |
Box 2 | Folder 180 | October 12, 1989. Transfer structure as viewed from second level |
Box 2 | Folder 181 | October 12, 1989. Second level south, electrified dock installation |
Box 2 | Folder 182 | October 12, 1989. Fourth level, south west, dock pour |
Box 2 | Folder 183 | October 12, 1989. Fourth level south, saw tooth perimeter beam |
Box 2 | Folder 184 | October 12, 1989. Slab depression for electrical deck crossover |
Box 2 | Folder 185 | October 12, 1989. Fourth level, electrical cave from north crane |
Box 2 | Folder 186 | October 30, 1989. Electrical conduit installation |
Box 2 | Folder 187 | October 30, 1989. Raker removal at elevator core |
Box 2 | Folder 188 | October 30, 1989. Lower level, conduit installation |
Box 2 | Folder 189 | October 30, 1989. SOG pour, south west corner |
Box 2 | Folder 190 | October 30, 1989. SOG finish, south east corner |
Box 2 | Folder 191 | October 30, 1989. Lower level, T-cav conduits |
Box 2 | Folder 192 | October 30, 1989. Ground level, temporary winter enclosure |
Box 2 | Folder 193 | October 30, 1989. Window arch. Form work at State Street |
Box 2 | Folder 194 | October 30, 1989. Ground level south, fire sprinklers |
Box 2 | Folder 195 | October 30, 1989. Water test, loading dock |
Box 2 | Folder 196 | October 30, 1989. Lower level, spoil removal |
Box 2 | Folder 197 | October 30, 1989. Embeds for conc. Structure |
Box 2 | Folder 198 | October 30, 1989. Second level south, duct work installation |
Box 2 | Folder 199 | October 30, 1989. Second level, Vav boxes |
Box 2 | Folder 200 | October 30, 1989. Third level, electrical deck |
Box 3 | Folder 201 | October 30, 1989. Form work mobilization |
Box 3 | Folder 202 | October 30, 1989. Fifth level, reinforced steel at elevator core |
Box 3 | Folder 203 | October 30, 1989. Fifth level, south |
Box 3 | Folder 204 | October 30, 1989. Sixth level, north |
Box 3 | Folder 205 | October 30, 1989. Sixth level, south |
Box 3 | Folder 206 | October 30, 1989. Fourth level, form work removal |
Box 3 | Folder 207 | October 30, 1989. South west corner |
Box 3 | Folder 208 | October 30, 1989. South east corner |
Box 3 | Folder 209 | October 30, 1989. North east corner |
Box 3 | Folder 210 | October 30, 1989. North west corner |
Box 3 | Folder 211 | October 30, 1989. North half |
Box 3 | Folder 212 | October 30, 1989. South half |
Box 3 | Folder 213 | November 16, 1989. Mortar silo |
Box 3 | Folder 214 | November 16, 1989. Skip hoist base pad |
Box 3 | Folder 215 | November 16, 1989. Ground level, north west, pipe installation |
Box 3 | Folder 216 | November 16, 1989. Auditorium wall footing |
Box 3 | Folder 217 | November 16, 1989. Lower level, audio visual area |
Box 3 | Folder 218 | November 16, 1989. Lower level, south west corner |
Box 3 | Folder 219 | November 16, 1989. Lower level, west, conduit at raker |
Box 3 | Folder 220 | November 16, 1989. Ground level, south east corner, mechanical |
Box 3 | Folder 221 | November 16, 1989. Ground level, south west corner, mechanical |
Box 3 | Folder 222 | November 16, 1989. Second level, south west corner, mechanical |
Box 3 | Folder 223 | November 16, 1989. Complex lobby |
Box 3 | Folder 224 | November 16, 1989. Ground level, fountain form work |
Box 3 | Folder 225 | November 16, 1989. Third level, looking south |
Box 3 | Folder 226 | November 16, 1989. Fourth level, north west corner |
Box 3 | Folder 227 | November 16, 1989. Fourth level, north east corner |
Box 3 | Folder 228 | November 16, 1989. Fifth level, north west corner |
Box 3 | Folder 229 | November 16, 1989. Sixth level, south east corner |
Box 3 | Folder 230 | November 16, 1989. Sixth level, south west corner shearwall |
Box 3 | Folder 231 | November 16, 1989. Architectural column form work |
Box 3 | Folder 232 | November 16, 1989. Seventh level, north ½ form work |
Box 3 | Folder 233 | November 30, 1989. Ground level, hoist off load ramp |
Box 3 | Folder 234 | November 30, 1989. Mechanical equipment glas. E |
Box 3 | Folder 235 | November 30, 1989. Second level, south east, Vav box installation |
Box 3 | Folder 236 | November 30, 1989. Second level, vent piping |
Box 3 | Folder 237 | November 30, 1989. Second level, restroom plumbing |
Box 3 | Folder 238 | November 30, 1989. Third level, looking north |
Box 3 | Folder 239 | November 30, 1989. Third level, north west, mechanical installation |
Box 3 | Folder 240 | November 30, 1989. Third level, block back-up layout |
Box 3 | Folder 241 | November 30, 1989. Fourth level, south west, concrete topping |
Box 3 | Folder 242 | November 30, 1989. Fifth level, north east |
Box 3 | Folder 243 | November 30, 1989. Sixth level, north east, deck removal |
Box 3 | Folder 244 | November 30, 1989. Sixth level, deck removal |
Box 3 | Folder 245 | November 30, 1989. Seventh level, deck steel placement |
Box 3 | Folder 246 | November 30, 1989. Eighth level, deck forming |
Box 3 | Folder 247 | November 30, 1989. Eighth level, elevation core wall |
Box 3 | Folder 248 | November 30, 1989. North elevation, north west corner |
Box 3 | Folder 249 | November 30, 1989. North skip hoist installation |
Box 3 | Folder 250 | November 30, 1989. North half |
Box 3 | Folder 251 | November 30, 1989. South half |
Box 3 | Folder 252 | November 30, 1989. South west corner |
Box 3 | Folder 253 | November 30, 1989. Looking north |
Box 3 | Folder 254 | November 30, 1989. South east corner |
Box 3 | Folder 255 | November 30, 1989. East elevation |
Box 3 | Folder 256 | December 12, 1989. Auditorium, looking south |
Box 3 | Folder 257 | December 12, 1989. Lower level, cable tray, looking north west corner |
Box 3 | Folder 258 | December 12, 1989. Lower level, SOG, elevator area |
Box 3 | Folder 259 | December 12, 1989. Ground level, south west corner, mechanical |
Box 3 | Folder 260 | December 12, 1989. Ground level, south east corner |
Box 3 | Folder 261 | December 12, 1989. Second level, looking south |
Box 3 | Folder 262 | December 12, 1989. Second level, escalator openings |
Box 3 | Folder 263 | December 12, 1989. Second level, gas piping |
Box 3 | Folder 264 | December 12, 1989. Second level, cooling tower piping |
Box 3 | Folder 265 | December 12, 1989. Third level, looking north east |
Box 3 | Folder 266 | December 12, 1989. Third level, south west corner |
Box 3 | Folder 267 | December 12, 1989. Third level, block back-up |
Box 3 | Folder 268 | December 12, 1989. Brick arch, block back-up |
Box 3 | Folder 269 | December 12, 1989. Fifth level, slab topping, south east |
Box 3 | Folder 270 | December 12, 1989. Fifth level, rub and patch architectural column |
Box 3 | Folder 271 | December 12, 1989. Fifth level, south west corner |
Box 3 | Folder 272 | December 12, 1989. Fourth level, looking south east |
Box 3 | Folder 273 | December 12, 1989. Sixth level, looking south east |
Box 3 | Folder 274 | December 12, 1989. Sixth level, looking north |
Box 3 | Folder 275 | December 12, 1989. Seventh level, north west, form work removal |
Box 3 | Folder 276 | December 12, 1989. Eighth level, north east |
Box 3 | Folder 277 | December 12, 1989. Eighth level, west pour |
Box 3 | Folder 278 | December 12, 1989. Eighth level, west pour |
Box 3 | Folder 279 | December 12, 1989. Structure steel column base plate |
Box 3 | Folder 280 | December 29, 1989. North elevation |
Box 3 | Folder 281 | December 29, 1989. North west corner |
Box 3 | Folder 282 | December 29, 1989. South west corner |
Box 3 | Folder 283 | December 29, 1989. South east corner |
Box 3 | Folder 284 | December 29, 1989. South elevation |
Box 3 | Folder 285 | December 29, 1989. South west corner |
Box 3 | Folder 286 | December 29, 1989. North half |
Box 3 | Folder 287 | December 29, 1989. South half |
Box 3 | Folder 288 | December 29, 1989. Raker removal |
Box 3 | Folder 289 | December 29, 1989. SOG video auditorium |
Box 3 | Folder 290 | December 29, 1989. TC/AV conduit auditorium |
Box 3 | Folder 291 | December 29, 1989. MEP truck dock |
Box 3 | Folder 292 | December 29, 1989. Stair erection |
Box 3 | Folder 293 | December 29, 1989. Second level, plumbing rough-in |
Box 3 | Folder 294 | December 29, 1989. Second level, electrical sprinklers |
Box 3 | Folder 295 | December 29, 1989. Third level, north, block work |
Box 3 | Folder 296 | December 29, 1989. Third level, HVAC south |
Box 3 | Folder 297 | December 29, 1989. Fourth level, duct north |
Box 3 | Folder 298 | December 29, 1989. Fourth level, building enclosure |
Box 3 | Folder 299 | December 29, 1989. Fifth level, north east |
Box 3 | Folder 300 | December 29, 1989. Stripping eighth level deck |
Box 4 | Folder 301 | December 29, 1989. Eighth and ninth levels, columns scaffold |
Box 4 | Folder 302 | December 29, 1989. Anchor bolts columns |
Box 4 | Folder 303 | January 12, 1990. Lower level, T-cav conduit |
Box 4 | Folder 304 | January 12, 1990. Lower level, fans units |
Box 4 | Folder 305 | January 12, 1990. Lower level, electrical switchboards |
Box 4 | Folder 306 | January 12, 1990. Lower level, slab in-fill at raker openings |
Box 4 | Folder 307 | January 12, 1990. Ground level, masonry, south east corner |
Box 4 | Folder 308 | January 12, 1990. Ground level, stair elevator core |
Box 4 | Folder 309 | January 12, 1990. Second level, duct work CMU stocking |
Box 4 | Folder 310 | January 12, 1990. Second level, duct work insulation |
Box 4 | Folder 311 | January 12, 1990. Third level, looking north west |
Box 4 | Folder 312 | January 12, 1990. Third level, looking south |
Box 4 | Folder 313 | January 12, 1990. Fourth level, masonry, south east |
Box 4 | Folder 314 | January 12, 1990. Fourth level, masonry, north |
Box 4 | Folder 315 | January 12, 1990. Fifth level, CMU stocking |
Box 4 | Folder 316 | January 12, 1990. Fifth level, south east |
Box 4 | Folder 317 | January 12, 1990. Sixth level, looking south |
Box 4 | Folder 318 | January 12, 1990. Seventh level, looking south east |
Box 4 | Folder 319 | January 12, 1990. Eighth level, south end |
Box 4 | Folder 320 | January 12, 1990. Ninth level, south end |
Box 4 | Folder 321 | January 12, 1990. Ninth level, north end |
Box 4 | Folder 322 | January 12, 1990. Ninth level, S.S., column anchor bolts |
Box 4 | Folder 323 | January 12, 1990. Ninth level, S.S., column anchor bolts |
Box 4 | Folder 324 | January 12, 1990. Toward cranes |
Box 4 | Folder 325 | January 12, 1990. Wall form work dismantling |
Box 4 | Folder 326 | January 12, 1990. Ninth level, east perimeter beam |
Box 4 | Folder 327 | January 12, 1990. Ninth level, S.S., column anchor bolts |
Box 4 | Folder 328 | January 25, 1990. Lower level, auditorium SOG |
Box 4 | Folder 329 | January 25, 1990. Lower level, looking south west |
Box 4 | Folder 330 | January 25, 1990. Ground level, garage topping slab |
Box 4 | Folder 331 | January 25, 1990. Ground level, looking north east |
Box 4 | Folder 332 | January 25, 1990. Back fill at north elevation |
Box 4 | Folder 333 | January 25, 1990. Ground level, escalator landing |
Box 4 | Folder 334 | January 25, 1990. Second level, pt stressing |
Box 4 | Folder 335 | January 25, 1990. Complex lobby |
Box 4 | Folder 336 | January 25, 1990. Second level, pt stressing |
Box 4 | Folder 337 | January 25, 1990. North crane removal |
Box 4 | Folder 338 | January 25, 1990. Third level, duct pressure test |
Box 4 | Folder 339 | January 25, 1990. Third level, sprinkler pipe drain valve |
Box 4 | Folder 340 | January 25, 1990. Brick arch mock-up |
Box 4 | Folder 341 | January 25, 1990. Fourth level, looking south |
Box 4 | Folder 342 | January 25, 1990. Fifth level, looking north west |
Box 4 | Folder 343 | January 25, 1990. Fifth level, south west topping pour |
Box 4 | Folder 344 | January 25, 1990. Sixth level, north east topping pour |
Box 4 | Folder 345 | January 25, 1990. Sixth level, looking south |
Box 4 | Folder 346 | January 25, 1990. Seventh level, looking north |
Box 4 | Folder 347 | January 25, 1990. Seventh level, concrete arch beams |
Box 4 | Folder 348 | January 25, 1990. Seventh level, looking south |
Box 4 | Folder 349 | January 25, 1990. Eighth level, looking north west |
Box 4 | Folder 350 | January 25, 1990. Eighth level, looking south |
Box 4 | Folder 351 | January 25, 1990. Ninth level, elevation core wall |
Box 4 | Folder 352 | January 25, 1990. Ninth level, looking south |
Box 4 | Folder 353 | January 25, 1990. Ninth level, east elevation |
Box 4 | Folder 354 | January 25, 1990. Ninth level, man hoist |
Box 4 | Folder 355 | January 25, 1990. Plymouth Court |
Box 4 | Folder 356 | January 25, 1990. Block wall, east elevation |
Box 4 | Folder 357 | January 25, 1990. Deck pour last structure |
Box 4 | Folder 358 | January 25, 1990. G.V., north half, looking east |
Box 4 | Folder 359 | January 25, 1990. G.V., south half, looking east |
Box 4 | Folder 360 | January 25, 1990. G.V., looking north east |
Box 4 | Folder 361 | January 25, 1990. G.V., looking north west |
Box 4 | Folder 362 | January 25, 1990. G.V., looking south |
Box 4 | Folder 363 | February 16, 1990. Lower level, CMU auditorium wall |
Box 4 | Folder 364 | February 16, 1990. Lower level, CMU wall |
Box 4 | Folder 365 | February 16, 1990. Lower level, electrical cables, south east corner |
Box 4 | Folder 366 | February 16, 1990. Lower level, CMU wall, south west corner |
Box 4 | Folder 367 | February 16, 1990. Ground level, escalators, meze and fountain |
Box 4 | Folder 368 | February 16, 1990. Ground level, loading dock area |
Box 4 | Folder 369 | February 16, 1990. Second level, south west corner |
Box 4 | Folder 370 | February 16, 1990. Second level, pt slab opening |
Box 4 | Folder 371 | February 16, 1990. Third level, north |
Box 4 | Folder 372 | February 16, 1990. Third level, south |
Box 4 | Folder 373 | February 16, 1990. Third level, brick swingstage |
Box 4 | Folder 374 | February 16, 1990. Third level, north stair |
Box 4 | Folder 375 | February 16, 1990. Fourth level, south |
Box 4 | Folder 376 | February 16, 1990. Fourth level, stair installation |
Box 4 | Folder 377 | February 16, 1990. Fourth level, electrical cable tray |
Box 4 | Folder 378 | February 16, 1990. Fifth level, looking north east |
Box 4 | Folder 379 | February 16, 1990. Fifth level, HVAC installation |
Box 4 | Folder 380 | February 16, 1990. Fifth level, tower crane opening in-fill |
Box 4 | Folder 381 | February 16, 1990. Sixth level, south |
Box 4 | Folder 382 | February 16, 1990. Sixth level, north west corner |
Box 4 | Folder 383 | February 16, 1990. Seventh level, north wall CMU back-up |
Box 4 | Folder 384 | February 16, 1990. Seventh level, north east corner |
Box 4 | Folder 385 | February 16, 1990. Seventh level, east perimeter |
Box 4 | Folder 386 | February 16, 1990. Eighth level, north east |
Box 4 | Folder 387 | February 16, 1990. Eighth level, tower crane opening in-fill |
Box 4 | Folder 388 | February 16, 1990. Ninth level, structural steel derrick |
Box 4 | Folder 389 | February 16, 1990. Ninth level, elevator core |
Box 4 | Folder 390 | February 16, 1990. Ninth level, structural steel anchor bolts |
Box 4 | Folder 391 | February 16, 1990. Ninth level, north |
Box 4 | Folder 392 | February 16, 1990. Ninth level, south |
Box 4 | Folder 393 | February 28, 1990. Ninth level, north east corner, steel erection |
Box 4 | Folder 394 | February 28, 1990. Ninth level, looking north |
Box 4 | Folder 395 | February 28, 1990. Ninth level, derrick mtr. Shanty |
Box 4 | Folder 396 | February 28, 1990. Eighth level, electrical layout |
Box 4 | Folder 397 | February 28, 1990. Seventh level, out-rigger erection |
Box 4 | Folder 398 | February 28, 1990. Seventh level, north CMU wall |
Box 4 | Folder 399 | February 28, 1990. Sixth level, HVAL duct installation |
Box 4 | Folder 400 | February 28, 1990. Sixth and seventh levels, stair installation |
Box 5 | Folder 401 | February 28, 1990. Fifth level, plumbing |
Box 5 | Folder 402 | February 28, 1990. Fifth level, sprinkler header |
Box 5 | Folder 403 | February 28, 1990. Fifth level, looking south |
Box 5 | Folder 404 | February 28, 1990. Fourth level, north east |
Box 5 | Folder 405 | February 28, 1990. Fourth level, south east stair installation |
Box 5 | Folder 406 | February 28, 1990. Fourth level, west, drywall layout |
Box 5 | Folder 407 | February 28, 1990. Third level, HVAC duct insulation |
Box 5 | Folder 408 | February 28, 1990. Third level, east external wall insulation |
Box 5 | Folder 409 | February 28, 1990. Second level, south west pt cap |
Box 5 | Folder 410 | February 28, 1990. Lower level, south west, mechanical room pad layout |
Box 5 | Folder 411 | February 28, 1990. Lower level, south raker closer |
Box 5 | Folder 412 | February 28, 1990. Lower level, north, auditorium, CMU wall |
Box 5 | Folder 413 | February 28, 1990. Lower level, north west, mechanical room pad layout |
Box 5 | Folder 414 | February 28, 1990. Lower level, pipe installation |
Box 5 | Folder 415 | February 28, 1990. Ground level, north, auditorium CMU wall |
Box 5 | Folder 416 | February 28, 1990. Ground level, auditorium wire nest |
Box 5 | Folder 417 | February 28, 1990. North elevation |
Box 5 | Folder 418 | February 28, 1990. North half |
Box 5 | Folder 419 | February 28, 1990. South half |
Box 5 | Folder 420 | February 28, 1990. South elevation |
Box 5 | Folder 421 | February 28, 1990. South east corner |
Box 5 | Folder 422 | February 28, 1990. East elevation |
Box 5 | Folder 423 | March 15, 1990. Lower level, raker removal, north west corner |
Box 5 | Folder 424 | March 15, 1990. CMU walls |
Box 5 | Folder 425 | March 15, 1990. Lower level, escalators |
Box 5 | Folder 426 | March 15, 1990. Lower level, box cut for future subway |
Box 5 | Folder 427 | March 15, 1990. Lower level, chiller installation |
Box 5 | Folder 428 | March 15, 1990. Ground level, escalator at mezzanine landing |
Box 5 | Folder 429 | March 15, 1990. Ground level, chiller access opening |
Box 5 | Folder 430 | March 15, 1990. Ground level, CMU wall stairway |
Box 5 | Folder 431 | March 15, 1990. Second level, escalator |
Box 5 | Folder 432 | March 15, 1990. Second level, complex lobby |
Box 5 | Folder 433 | March 15, 1990. Third level, stair # 2 installation |
Box 5 | Folder 434 | March 15, 1990. Third level, exterior brick, north elevation |
Box 5 | Folder 435 | March 15, 1990. Third level, exterior brick, north west corner |
Box 5 | Folder 436 | March 15, 1990. Fourth level, wall layout |
Box 5 | Folder 437 | March 15, 1990. Fourth level, HVAC installation |
Box 5 | Folder 438 | March 15, 1990. Fifth level, looking north |
Box 5 | Folder 439 | March 15, 1990. Fifth level, stair installation |
Box 5 | Folder 440 | March 15, 1990. Sixth level, view of Plymouth Court |
Box 5 | Folder 441 | March 15, 1990. Sixth level, looking north |
Box 5 | Folder 442 | March 15, 1990. Seventh level, south perimeter |
Box 5 | Folder 443 | March 15, 1990. Seventh level, escalator opening |
Box 5 | Folder 444 | March 15, 1990. Eighth level, under floor ducts |
Box 5 | Folder 445 | March 15, 1990. Eighth level, looking south |
Box 5 | Folder 446 | March 15, 1990. Eighth level, topping slab formwork |
Box 5 | Folder 447 | March 15, 1990. Ninth level, freight elevator |
Box 5 | Folder 448 | March 15, 1990. Ninth level, structural steel |
Box 5 | Folder 449 | March 15, 1990. Ninth level, cooling tower support framing |
Box 5 | Folder 450 | March 15, 1990. Ninth level, north corridor |
Box 5 | Folder 451 | March 15, 1990. Ninth level, north, restaurant |
Box 5 | Folder 452 | March 15, 1990. Backfill, north elevation |
Box 5 | Folder 453 | March 30, 1990. G.V., looking south east |
Box 5 | Folder 454 | March 30, 1990. G.V., looking south |
Box 5 | Folder 455 | March 30, 1990. West elevation |
Box 5 | Folder 456 | March 30, 1990. South west corner |
Box 5 | Folder 457 | March 30, 1990. South east corner |
Box 5 | Folder 458 | March 30, 1990. Looking north |
Box 5 | Folder 459 | March 30, 1990. Auditorium slab |
Box 5 | Folder 460 | March 30, 1990. Lower level, CMU wall |
Box 5 | Folder 461 | March 30, 1990. Lower level, electrical rough-in |
Box 5 | Folder 462 | March 30, 1990. Lower level, south mechanical room |
Box 5 | Folder 463 | March 30, 1990. West elevation, curtain wall framing |
Box 5 | Folder 464 | March 30, 1990. Elevator equipment |
Box 5 | Folder 465 | March 30, 1990. Ground level, south east corner |
Box 5 | Folder 466 | March 27, 1990. Ground level, view from main entry |
Box 5 | Folder 467 | March 30, 1990. Second level, metal studs, south west corner |
Box 5 | Folder 468 | March 30, 1990. Second level, metal studs, looking north |
Box 5 | Folder 469 | March 30, 1990. Second level, Ceco vault room |
Box 5 | Folder 470 | March 30, 1990. Third level, stock drywall |
Box 5 | Folder 471 | March 30, 1990. Third level, stairway cleanup |
Box 5 | Folder 472 | March 30, 1990. Third level, escalator unit staging |
Box 5 | Folder 473 | March 30, 1990. Fourth level, looking south |
Box 5 | Folder 474 | March 30, 1990. West, cast stone, north elevation |
Box 5 | Folder 475 | March 30, 1990. Shelf angle, north elevation |
Box 5 | Folder 476 | March 30, 1990. Fifth level, looking south |
Box 5 | Folder 477 | March 30, 1990. Fifth level, south escalator tower |
Box 5 | Folder 478 | March 30, 1990. Sixth level, looking north |
Box 5 | Folder 479 | March 30, 1990. Seventh level, duct work installation |
Box 5 | Folder 480 | March 30, 1990. Seventh level, plumbing installation |
Box 5 | Folder 481 | March 30, 1990. Seventh level, escalator support frame |
Box 5 | Folder 482 | March 30, 1990. Eighth level, looking south |
Box 5 | Folder 483 | March 30, 1990. Cooling tower |
Box 5 | Folder 484 | March 30, 1990. Ninth level, structural steel |
Box 5 | Folder 485 | March 30, 1990. Ninth level, looking north |
Box 5 | Folder 486 | March 30, 1990. Freight elevator shaft |
Box 5 | Folder 487 | March 30, 1990. North west elevation |
Box 5 | Folder 488 | March 30, 1990. North half |
Box 5 | Folder 489 | March 30, 1990. South half |
Box 5 | Folder 490 | March 30, 1990. Auditorium slab pour |
Box 5 | Folder 491 | April 12, 1990. Lower level, CMU walls at stair |
Box 5 | Folder 492 | April 12, 1990. Lower level, CMU walls |
Box 5 | Folder 493 | April 12, 1990. Lower level, duct work insulation |
Box 5 | Folder 494 | April 12, 1990. Lower level, south east, mechanical room |
Box 5 | Folder 495 | April 12, 1990. Lower level, view of auditorium slab |
Box 5 | Folder 496 | April 12, 1990. Ground level, parking deck water test |
Box 5 | Folder 497 | April 12, 1990. Ground level, lobby, looking south |
Box 5 | Folder 498 | April 12, 1990. Second level, escalator |
Box 5 | Folder 499 | April 12, 1990. Second level, south east corner |
Box 5 | Folder 500 | April 12, 1990. Second level, ceiling mock-up |
Box 6 | Folder 501 | April 12, 1990. Third level, exterior wall insulation |
Box 6 | Folder 502 | April 12, 1990. Third level, escalator tower, south |
Box 6 | Folder 503 | April 12, 1990. Third level, escalator tower, north |
Box 6 | Folder 504 | April 12, 1990. Fourth level, north west corner |
Box 6 | Folder 505 | April 12, 1990. Fourth level, escalator support framing |
Box 6 | Folder 506 | April 12, 1990. Fourth level, east wall |
Box 6 | Folder 507 | April 12, 1990. Fifth level, east wall |
Box 6 | Folder 508 | April 12, 1990. Fifth level, escalator, south |
Box 6 | Folder 509 | April 12, 1990. Sixth level, duct installation |
Box 6 | Folder 510 | April 12, 1990. Sixth level, looking north |
Box 6 | Folder 511 | April 12, 1990. Sixth level, curtain wall framing |
Box 6 | Folder 512 | April 12, 1990. Seventh level, looking north |
Box 6 | Folder 513 | April 12, 1990. Eighth level, north end |
Box 6 | Folder 514 | April 12, 1990. Eighth level, looking south |
Box 6 | Folder 515 | April 12, 1990. Ninth level, north east, mechanical room |
Box 6 | Folder 516 | April 12, 1990. Ninth level, looking south |
Box 6 | Folder 517 | April 12, 1990. Elevator core |
Box 6 | Folder 518 | April 12, 1990. Derrick setup |
Box 6 | Folder 519 | April 12, 1990. Structural steel, looking north |
Box 6 | Folder 520 | April 12, 1990. Ninth level, west perimeter |
Box 6 | Folder 521 | April 12, 1990. Tenth level, looking east |
Box 6 | Folder 522 | April 12, 1990. Tenth level, north east corner |
Box 6 | Folder 523 | April 12, 1990. Tenth level, north west, mechanical room |
Box 6 | Folder 524 | April 12, 1990. Tenth level, north wall |
Box 6 | Folder 525 | April 12, 1990. North east, low roof |
Box 6 | Folder 526 | April 26, 1990. South east corner |
Box 6 | Folder 527 | April 26, 1990. South elevation |
Box 6 | Folder 528 | April 26, 1990. East elevation |
Box 6 | Folder 529 | April 26, 1990. North elevation |
Box 6 | Folder 530 | April 26, 1990. Lower level, shop room |
Box 6 | Folder 531 | April 26, 1990. Lower level, hyp. Elevation piston shaft |
Box 6 | Folder 532 | April 26, 1990. Lower level, chiller pip. |
Box 6 | Folder 533 | April 26, 1990. Ground level, auditorium floor |
Box 6 | Folder 534 | April 26, 1990. Ground level, north parking area |
Box 6 | Folder 535 | April 26, 1990. Second level, north mechanical ext. vnt. |
Box 6 | Folder 536 | April 26, 1990. Second level, west mezzanine |
Box 6 | Folder 537 | April 26, 1990. South elevation, concrete damp-proofing |
Box 6 | Folder 538 | April 26, 1990. Third level, arch window sill damp-proof |
Box 6 | Folder 539 | April 26, 1990. Third level, Ceco closet stairs, south east |
Box 6 | Folder 540 | April 26, 1990. Third level, looking north |
Box 6 | Folder 541 | April 26, 1990. Fourth level, looking north |
Box 6 | Folder 542 | April 26, 1990. Fourth level, north elevation arch window angle |
Box 6 | Folder 543 | April 26, 1990. Fourth level, north elevation, brick work |
Box 6 | Folder 544 | April 26, 1990. Fifth level, looking north |
Box 6 | Folder 545 | April 26, 1990. Fifth level, looking south west |
Box 6 | Folder 546 | April 26, 1990. Sixth partition layout crew |
Box 6 | Folder 547 | April 26, 1990. Sixth level, in-fill slab finisher |
Box 6 | Folder 548 | April 26, 1990. Sixth level, electrical rough-in |
Box 6 | Folder 549 | April 26, 1990. Seventh level, looking north |
Box 6 | Folder 550 | April 26, 1990. Seventh level, electrical rough-in |
Box 6 | Folder 551 | April 26, 1990. Eighth level, sprinkler rough-in |
Box 6 | Folder 552 | April 26, 1990. Eighth level, looking south east |
Box 6 | Folder 553 | April 26, 1990. Eighth level, north west corner, storm drain |
Box 6 | Folder 554 | April 26, 1990. Ninth level, steel erection |
Box 6 | Folder 555 | April 26, 1990. Ninth level, Winter Garden, looking south |
Box 6 | Folder 556 | April 26, 1990. Ninth level, looking at south east corner |
Box 6 | Folder 557 | April 26, 1990. Dividing beam installation pass elevation |
Box 6 | Folder 558 | April 26, 1990. Tenth level, looking south east |
Box 6 | Folder 559 | April 26, 1990. Tenth level, walker duct installation |
Box 6 | Folder 560 | April 26, 1990. North east, low roof, looking west |
Box 6 | Folder 561 | April 26, 1990. Winter Garden from bridge |
Box 6 | Folder 562 | April 26, 1990. Eleventh level, looking at south east corner |
Box 6 | Folder 563 | April 26, 1990. North half |
Box 6 | Folder 564 | April 26, 1990. South half |
Box 6 | Folder 565 | May 15, 1990. Tenth level, looking north across Winter Garden |
Box 6 | Folder 566 | May 15, 1990. Tenth level, looking south west corner |
Box 6 | Folder 567 | May 15, 1990. Eleventh level, looking south west corner |
Box 6 | Folder 568 | May 15, 1990. Tenth level, looking south |
Box 6 | Folder 569 | May 15, 1990. Tenth level, looking north east corner |
Box 6 | Folder 570 | May 15, 1990. North elevator dividing beam |
Box 6 | Folder 571 | May 15, 1990. Ninth level, east, brick scaffold beams |
Box 6 | Folder 572 | May 15, 1990. Ninth level, south west corner, looking north |
Box 6 | Folder 573 | May 15, 1990. Ninth level, looking north |
Box 6 | Folder 574 | May 15, 1990. Eighth level, chilled water piping |
Box 6 | Folder 575 | May 15, 1990. Eighth level, escalators |
Box 6 | Folder 576 | May 15, 1990. Eighth level, view south |
Box 6 | Folder 577 | May 15, 1990. Seventh level, north east plumb chase |
Box 6 | Folder 578 | May 15, 1990. Seventh level, looking north west |
Box 6 | Folder 579 | May 15, 1990. Sixth level, ceiling electric |
Box 6 | Folder 580 | May 15, 1990. Sixth level, looking north west corner |
Box 6 | Folder 581 | May 15, 1990. Fifth level, north brick |
Box 6 | Folder 582 | May 15, 1990. Fifth level, looking north |
Box 6 | Folder 583 | May 15, 1990. Fourth level, view north west |
Box 6 | Folder 584 | May 15, 1990. Fourth level, ceiling electric |
Box 6 | Folder 585 | May 15, 1990. Fourth level, duct work |
Box 6 | Folder 586 | May 15, 1990. Third level, curtain wall erection |
Box 6 | Folder 587 | May 15, 1990. Third level, view looking west |
Box 6 | Folder 588 | May 15, 1990. Third level, brick at window |
Box 6 | Folder 589 | May 15, 1990. Second level, setting door frames |
Box 6 | Folder 590 | May 15, 1990. Second level, view north west |
Box 6 | Folder 591 | May 15, 1990. Ground level, down to chiller room |
Box 6 | Folder 592 | May 15, 1990. Mezzanine, escalators and pool |
Box 6 | Folder 593 | May 15, 1990. Ground level, auditorium |
Box 6 | Folder 594 | May 15, 1990. Ground level, west elevation |
Box 6 | Folder 595 | May 15, 1990. Lower level, interior masonry |
Box 6 | Folder 596 | May 15, 1990. Lower level, masonry |
Box 6 | Folder 597 | May 15, 1990. Lower level, north west from fan room |
Box 6 | Folder 598 | May 30, 1990. South east corner |
Box 6 | Folder 599 | May 30, 1990. East elevation |
Box 6 | Folder 600 | May 30, 1990. West elevation |
Box 7 | Folder 601 | May 30, 1990. Lower level, looking south east |
Box 7 | Folder 602 | May 30, 1990. Chiller room, south end |
Box 7 | Folder 603 | May 30, 1990. Lower level, masonry in progress |
Box 7 | Folder 604 | May 30, 1990. Ground level, masonry and electrical service |
Box 7 | Folder 605 | May 30, 1990. Mezzanine level, looking east |
Box 7 | Folder 606 | May 30, 1990. Second level, finish plaster |
Box 7 | Folder 607 | May 30, 1990. Second level, escalators |
Box 7 | Folder 608 | May 30, 1990. Second level, metal studs/gypsum board |
Box 7 | Folder 609 | May 30, 1990. Third level, view looking north west corner |
Box 7 | Folder 610 | May 30, 1990. Third level, view along east interior |
Box 7 | Folder 611 | May 30, 1990. Third level, terrazzo preparation |
Box 7 | Folder 612 | May 30, 1990. Fourth level, east perimeter alcoves |
Box 7 | Folder 613 | May 30, 1990. Fourth level, ceiling grid |
Box 7 | Folder 614 | May 30, 1990. Fourth level, east |
Box 7 | Folder 615 | May 30, 1990. Fifth level, partition layout, south |
Box 7 | Folder 616 | May 30, 1990. Fifth level, view west |
Box 7 | Folder 617 | May 30, 1990. Sixth level, north brick |
Box 7 | Folder 618 | May 30, 1990. Sixth level, masonry flashing |
Box 7 | Folder 619 | May 30, 1990. Sixth level, north masonry shelf angles |
Box 7 | Folder 620 | May 30, 1990. Seventh level, door frames |
Box 7 | Folder 621 | May 30, 1990. Seventh level, ceiling duct work |
Box 7 | Folder 622 | May 30, 1990. Eighth level, ceiling duct work |
Box 7 | Folder 623 | May 30, 1990. Eighth level, view south |
Box 7 | Folder 624 | May 30, 1990. Eighth level, electrical RI |
Box 7 | Folder 625 | May 30, 1990. Ninth level, masonry, north east corner |
Box 7 | Folder 626 | May 30, 1990. Ninth level, barrel vaults |
Box 7 | Folder 627 | May 30, 1990. Ninth level, looking south east corner |
Box 7 | Folder 628 | May 30, 1990. Tenth level, looking west |
Box 7 | Folder 629 | May 30, 1990. Tenth level, concrete, north west |
Box 7 | Folder 630 | May 30, 1990. Low roof, north east corner |
Box 7 | Folder 631 | May 30, 1990. North elevation |
Box 7 | Folder 632 | May 30, 1990. Roof, north half |
Box 7 | Folder 633 | May 30, 1990. Roof, south half |
Box 7 | Folder 634 | June 14, 1990. Tenth level, south between C-D line |
Box 7 | Folder 635 | June 14, 1990. Tenth level, south between H-S line |
Box 7 | Folder 636 | June 14, 1990. Ninth level, south west corner |
Box 7 | Folder 637 | June 14, 1990. Ninth level, looking south east from south west corner |
Box 7 | Folder 638 | June 14, 1990. Ninth level, looking east between line 4-5 |
Box 7 | Folder 639 | June 14, 1990. Ninth level, looking south east |
Box 7 | Folder 640 | June 14, 1990. Ninth level, looking north east |
Box 7 | Folder 641 | June 14, 1990. Seventh level, set-up spider at elevator shaft |
Box 7 | Folder 642 | June 14, 1990. Seventh level, north, HVAC above ceiling |
Box 7 | Folder 643 | June 14, 1990. Sixth level, patching architectural columns |
Box 7 | Folder 644 | June 14, 1990. Sixth level, west, mullions |
Box 7 | Folder 645 | June 14, 1990. Fifth level, south, stud wall construction |
Box 7 | Folder 646 | June 14, 1990. Fifth level, south east, layout electric room |
Box 7 | Folder 647 | June 14, 1990. Fifth level, bending conduit |
Box 7 | Folder 648 | June 14, 1990. Fourth level, insulating duct work |
Box 7 | Folder 649 | June 14, 1990. Fourth level, north, ceiling band suspension |
Box 7 | Folder 650 | June 14, 1990. Fourth level, south, ceiling bands |
Box 7 | Folder 651 | June 14, 1990. Third level, west side, chilled H2O lines |
Box 7 | Folder 652 | June 14, 1990. Third level, fabricating valve connection |
Box 7 | Folder 653 | June 14, 1990. Third level, south, electric room |
Box 7 | Folder 654 | June 14, 1990. Third level, drywall partition |
Box 7 | Folder 655 | June 14, 1990. Fourth level, south, alcove forming |
Box 7 | Folder 656 | June 14, 1990. Second level, ceiling bands |
Box 7 | Folder 657 | June 14, 1990. Second level, south stair well construction |
Box 7 | Folder 658 | June 14, 1990. Ground level, entry, stone mock-up |
Box 7 | Folder 659 | June 14, 1990. Ground level, northwest corner elevation, stone installation |
Box 7 | Folder 660 | June 14, 1990. Lower level, north west fan room, duct work |
Box 7 | Folder 661 | June 14, 1990. Lower level, west toilet room |
Box 7 | Folder 662 | June 27, 1990. Tenth level, 18” condensation pipe |
Box 7 | Folder 663 | June 27, 1990. Eleventh level, north east, roofing |
Box 7 | Folder 664 | June 27, 1990. Ninth level, Winter Garden roof |
Box 7 | Folder 665 | June 27, 1990. Eleventh level, Winter Garden |
Box 7 | Folder 666 | June 27, 1990. Roof, barrel roll section |
Box 7 | Folder 667 | June 27, 1990. Roofing insulation |
Box 7 | Folder 668 | June 27, 1990. Sky light framing |
Box 7 | Folder 669 | June 27, 1990. Tenth level, metal decking wire mesh |
Box 7 | Folder 670 | June 27, 1990. Ninth level, south west corner, under floor duct |
Box 7 | Folder 671 | June 27, 1990. Eighth level, FP standpipe riser at stair |
Box 7 | Folder 672 | June 27, 1990. Eighth level, tie-in drain for Winter Garden |
Box 7 | Folder 673 | June 27, 1990. Eighth level, south west corner, supp. air duct riser |
Box 7 | Folder 674 | June 27, 1990. Eighth level, duct installation |
Box 7 | Folder 675 | June 27, 1990. Seventh level, swing stage brace |
Box 7 | Folder 676 | June 27, 1990. Seventh level, WD brace for door frame |
Box 7 | Folder 677 | June 27, 1990. Seventh level, north, cutting stone |
Box 7 | Folder 678 | June 27, 1990. Seventh level, bar clamps for precast stone |
Box 7 | Folder 679 | June 27, 1990. Seventh level, bar clamps for precast stone |
Box 7 | Folder 680 | June 27, 1990. Sixth level, reading room, drywall ferring channels |
Box 7 | Folder 681 | June 27, 1990. Fifth level, duct installation |
Box 7 | Folder 682 | June 27, 1990. Fifth level, reading room, drywall |
Box 7 | Folder 683 | June 27, 1990. Fifth level, south corridor, metal studs |
Box 7 | Folder 684 | June 27, 1990. Fourth level, periodicals service center, drywall |
Box 7 | Folder 685 | June 27, 1990. Fourth level, horizontal drywall |
Box 7 | Folder 686 | June 27, 1990. Third level, terrazzo |
Box 7 | Folder 687 | June 27, 1990. Second level, backside |
Box 7 | Folder 688 | June 27, 1990. Ground level, block walls installation |
Box 7 | Folder 689 | June 27, 1990. Lower level, south east corner, fan room housing |
Box 7 | Folder 690 | June 27, 1990. Lower level, heat exchange rough-in |
Box 7 | Folder 691 | June 27, 1990. West elevation |
Box 7 | Folder 692 | June 27, 1990. North half |
Box 7 | Folder 693 | June 27, 1990. South half |
Box 7 | Folder 694 | June 27, 1990. East elevation |
Box 7 | Folder 695 | June 27, 1990. Looking north west |
Box 7 | Folder 696 | June 27, 1990. North elevation, looking south |
Box 7 | Folder 697 | July 12, 1990. Lower level, north west corner, fan room |
Box 7 | Folder 698 | July 12, 1990. Lower level, chiller room |
Box 7 | Folder 699 | July 12, 1990. Lower level, multipurpose room |
Box 7 | Folder 700 | July 12, 1990. Ground level, looking down into auditorium |
Box 8 | Folder 701 | July 12, 1990. North west corner, granite |
Box 8 | Folder 702 | July 12, 1990. North entrance, setting granite |
Box 8 | Folder 703 | July 12, 1990. North east corner, setting display window |
Box 8 | Folder 704 | July 12, 1990. Second level, west, corridor drywall |
Box 8 | Folder 705 | July 12, 1990. Second level, escalator, setting steps |
Box 8 | Folder 706 | July 12, 1990. Third level, terrazzo layout |
Box 8 | Folder 707 | July 12, 1990. Third level, escalator |
Box 8 | Folder 708 | July 12, 1990. Fourth level, alcove |
Box 8 | Folder 709 | July 12, 1990. Fourth level, masonry |
Box 8 | Folder 710 | July 12, 1990. Fourth level, east perimeter drywall |
Box 8 | Folder 711 | July 12, 1990. Fifth level, looking north |
Box 8 | Folder 712 | July 12, 1990. Fifth level, pipe insulation |
Box 8 | Folder 713 | July 12, 1990. Fifth level, west perimeter wall |
Box 8 | Folder 714 | July 12, 1990. Sixth level, west curtain wall |
Box 8 | Folder 715 | July 12, 1990. Sixth level, alcove rough-in |
Box 8 | Folder 716 | July 12, 1990. Seventh level, brick arch form |
Box 8 | Folder 717 | July 12, 1990. Eighth level, concrete clean up |
Box 8 | Folder 718 | July 12, 1990. Festoon close-up |
Box 8 | Folder 719 | July 12, 1990. Ninth level, north east corner, mechanical room |
Box 8 | Folder 720 | July 12, 1990. Ninth level, south east corner, duct |
Box 8 | Folder 721 | July 12, 1990. Tenth level, looking down, Winter Garden framing |
Box 8 | Folder 722 | July 12, 1990. Tenth level, concrete |
Box 8 | Folder 723 | July 12, 1990. Tenth level, bridge looking west |
Box 8 | Folder 724 | July 12, 1990. Sky light, north west corner, framing |
Box 8 | Folder 725 | July 12, 1990. Tenth level, elevator landing framing |
Box 8 | Folder 726 | July 12, 1990. Eleventh level, machine room |
Box 8 | Folder 727 | July 12, 1990. Eleventh level, looking east across Winter Garden |
Box 8 | Folder 728 | July 12, 1990. Sky light framing |
Box 8 | Folder 729 | July 12, 1990. Tenth level, chiller |
Box 8 | Folder 730 | July 26, 1990. South east corner, elevation |
Box 8 | Folder 731 | July 26, 1990. Setting display window granite |
Box 8 | Folder 732 | July 26, 1990. Curtain wall glazing |
Box 8 | Folder 733 | July 26, 1990. Lower level, studwork |
Box 8 | Folder 734 | July 26, 1990. Chiller supp./ret. |
Box 8 | Folder 735 | July 26, 1990. Lower level, lobby enclosure |
Box 8 | Folder 736 | July 26, 1990. Display window with granite |
Box 8 | Folder 737 | July 26, 1990. Ground level, looking down into auditorium |
Box 8 | Folder 738 | July 26, 1990. Ground level |
Box 8 | Folder 739 | July 26, 1990. South elevation, elevator scaffolding |
Box 8 | Folder 740 | July 26, 1990. Escalator power wire |
Box 8 | Folder 741 | July 26, 1990. Third level, plaster |
Box 8 | Folder 742 | July 26, 1990. Third level, terrazzo |
Box 8 | Folder 743 | July 26, 1990. Terrazzo work |
Box 8 | Folder 744 | July 26, 1990. Third level, drywall |
Box 8 | Folder 745 | July 26, 1990. Fourth level, alcove |
Box 8 | Folder 746 | July 26, 1990. Fourth level, ceiling |
Box 8 | Folder 747 | July 26, 1990. Fifth level, rock lath |
Box 8 | Folder 748 | July 26, 1990. Fifth level, partition frame |
Box 8 | Folder 749 | July 26, 1990. Fifth level, curtain glaze |
Box 8 | Folder 750 | July 26, 1990. Sixth level, looking north |
Box 8 | Folder 751 | July 26, 1990. Sixth level, rock lath |
Box 8 | Folder 752 | July 26, 1990. Seventh level, masonry |
Box 8 | Folder 753 | July 26, 1990. Seventh level, arches interior |
Box 8 | Folder 754 | July 26, 1990. Seventh level, partition work |
Box 8 | Folder 755 | July 26, 1990. Tenth level, looking over Winter Garden sky light glazing |
Box 8 | Folder 756 | July 26, 1990. Eleventh level, looking over Winter Garden |
Box 8 | Folder 757 | July 26, 1990. Lower roof, north east corner |
Box 8 | Folder 758 | July 26, 1990. East elevation |
Box 8 | Folder 759 | July 26, 1990. West elevation |
Box 8 | Folder 760 | July 26, 1990. North west corner, elevation |
Box 8 | Folder 761 | July 26, 1990. Roof, north half |
Box 8 | Folder 762 | July 26, 1990. Roof, south half |
Box 8 | Folder 763 | August 16, 1990. Video studio floor |
Box 8 | Folder 764 | August 16, 1990. Chiller room platform |
Box 8 | Folder 765 | August 16, 1990. Ground level, Congress Corridor, interior |
Box 8 | Folder 766 | August 16, 1990. Ground level, drywall partitions |
Box 8 | Folder 767 | August 16, 1990. Second level, partition work |
Box 8 | Folder 768 | August 16, 1990. Second level, bathroom tile |
Box 8 | Folder 769 | August 16, 1990. Setting elevator sill angle |
Box 8 | Folder 770 | August 16, 1990. Third level, north corridor, plaster work |
Box 8 | Folder 771 | August 16, 1990. Third level, ceiling grid |
Box 8 | Folder 772 | August 16, 1990. Third level, terrazzo bed |
Box 8 | Folder 773 | August 16, 1990. Second level, terrazzo |
Box 8 | Folder 774 | August 16, 1990. Third level, south elevation, brick |
Box 8 | Folder 775 | August 16, 1990. Third level, plaster partitions |
Box 8 | Folder 776 | August 16, 1990. Fifth level, north west corner |
Box 8 | Folder 777 | August 16, 1990. Fifth level, alcove ceiling |
Box 8 | Folder 778 | August 16, 1990. Fifth level, terrazzo base |
Box 8 | Folder 779 | August 16, 1990. East elevation, brick and precast stone |
Box 8 | Folder 780 | August 16, 1990. Seventh level, west corridor |
Box 8 | Folder 781 | August 16, 1990. North masonry arches |
Box 8 | Folder 782 | August 16, 1990. Festoons on exterior north wall |
Box 8 | Folder 783 | August 16, 1990. Ninth level, spray fire-proofing steel |
Box 8 | Folder 784 | August 16, 1990. Ninth level, north west corner, fan room |
Box 8 | Folder 785 | August 16, 1990. Tenth level, looking south over Winter Garden |
Box 8 | Folder 786 | August 16, 1990. Roof gutter, north west corner |
Box 8 | Folder 787 | August 16, 1990. Sky light, looking west |
Box 8 | Folder 788 | August 16, 1990. Elevator machine room masonry |
Box 8 | Folder 789 | August 16, 1990. Eleventh level, masonry |
Box 8 | Folder 790 | August 16, 1990. Roof corner framing |
Box 8 | Folder 791 | August 16, 1990. West pediment wall erection |
Box 8 | Folder 792 | August 16, 1990. Sixth level, ceiling grid |
Box 8 | Folder 793 | August 16, 1990. Fourth level, bathroom waterproofing |
Box 8 | Folder 794 | August 16, 1990. Second level, ceiling scaffold |
Box 8 | Folder 795 | August 16, 1990. North west corner, elevation, granite erection |
Box 8 | Folder 796 | August 16, 1990. South east corner, elevation |
Box 8 | Folder 797 | August 30, 1990. North elevation |
Box 8 | Folder 798 | August 30, 1990. West elevation |
Box 8 | Folder 799 | August 30, 1990. East elevation |
Box 8 | Folder 800 | August 30, 1990. South east corner, elevation |
Box 9 | Folder 801 | August 30, 1990. Lower level, corridor |
Box 9 | Folder 802 | August 30, 1990. Lower level, mechanical insulation |
Box 9 | Folder 803 | August 30, 1990. Lower level, mechanical/chiller room |
Box 9 | Folder 804 | August 30, 1990. Ground level, drywall finish |
Box 9 | Folder 805 | August 30, 1990. Ground level, State Street entrance |
Box 9 | Folder 806 | August 30, 1990. Lower level, auditorium ceiling scaffolding |
Box 9 | Folder 807 | August 30, 1990. Second level, corridor ceiling layout |
Box 9 | Folder 808 | August 30, 1990. Main lobby ceiling |
Box 9 | Folder 809 | August 30, 1990. Second level, ceiling finish |
Box 9 | Folder 810 | August 30, 1990. Third level, looking north |
Box 9 | Folder 811 | August 30, 1990. Third level, elevator lobby |
Box 9 | Folder 812 | August 30, 1990. Third level, bathroom tile |
Box 9 | Folder 813 | August 30, 1990. Fourth level, partitions |
Box 9 | Folder 814 | August 30, 1990. Fourth level, north corridor |
Box 9 | Folder 815 | August 30, 1990. Fifth level, plaster work |
Box 9 | Folder 816 | August 30, 1990. Fifth level, looking north |
Box 9 | Folder 817 | August 30, 1990. Fifth level, precast stone |
Box 9 | Folder 818 | August 30, 1990. Sixth level, east corridor ceiling |
Box 9 | Folder 819 | August 30, 1990. Sixth level, alcove precast ceiling |
Box 9 | Folder 820 | August 30, 1990. North wall exterior, festoon inspection |
Box 9 | Folder 821 | August 30, 1990. North east corner, brick arcass |
Box 9 | Folder 822 | August 30, 1990. West wall, sleeve in brick area |
Box 9 | Folder 823 | August 30, 1990. Eighth level, looking south |
Box 9 | Folder 824 | August 30, 1990. Eighth level, electrical ceiling rough-in |
Box 9 | Folder 825 | August 30, 1990. Ninth level, looking north up to sky light |
Box 9 | Folder 826 | August 30, 1990. Eleventh level, masonry |
Box 9 | Folder 827 | August 30, 1990. Cutter framing, south east corner |
Box 9 | Folder 828 | August 30, 1990. North half |
Box 9 | Folder 829 | August 30, 1990. South half |
Box 9 | Folder 830 | August 30, 1990. South west corner, elevation |
Box 9 | Folder 831 | September 13, 1990. Lower level, north east corner, fan room |
Box 9 | Folder 832 | September 13, 1990. Lower level, main lobby |
Box 9 | Folder 833 | September 13, 1990. Lower level, switch gear room |
Box 9 | Folder 834 | September 13, 1990. Ground level, main entrance |
Box 9 | Folder 835 | September 13, 1990. Ground level, auditorium |
Box 9 | Folder 836 | September 13, 1990. Mezzanine |
Box 9 | Folder 837 | September 13, 1990. Second level, Children’s Library |
Box 9 | Folder 838 | September 13, 1990. Second level, corridor |
Box 9 | Folder 839 | September 13, 1990. Third level, looking south |
Box 9 | Folder 840 | September 13, 1990. Third level, escalator enclosure |
Box 9 | Folder 841 | September 13, 1990. Third level, ceiling |
Box 9 | Folder 842 | September 13, 1990. Fourth level, south corridor |
Box 9 | Folder 843 | September 13, 1990. Fourth level, alcove plaster |
Box 9 | Folder 844 | September 13, 1990. Fourth level, clear story alcove |
Box 9 | Folder 845 | September 13, 1990. Fifth level, looking north west |
Box 9 | Folder 846 | September 13, 1990. Fifth level, terrazzo corridor |
Box 9 | Folder 847 | September 13, 1990. Fifth level, south wall, precast stone installation |
Box 9 | Folder 848 | September 13, 1990. Sixth level, plaster walls |
Box 9 | Folder 849 | September 13, 1990. Sixth level, escalator rails |
Box 9 | Folder 850 | September 13, 1990. Seventh level, masonry arches |
Box 9 | Folder 851 | September 13, 1990. Seventh level, partitions |
Box 9 | Folder 852 | September 13, 1990. Eighth level, looking at south east corner |
Box 9 | Folder 853 | September 13, 1990. East elevation, festoons |
Box 9 | Folder 854 | September 13, 1990. Ninth level, mechanical R-I |
Box 9 | Folder 855 | September 13, 1990. Ninth level, looking at north west corner |
Box 9 | Folder 856 | September 13, 1990. Ninth level, fan room |
Box 9 | Folder 857 | September 13, 1990. Tenth level, south exterior wall |
Box 9 | Folder 858 | September 13, 1990. Tenth level, looking over south west corner of Winter Garden |
Box 9 | Folder 859 | September 13, 1990. Eleventh level, cooling towers |
Box 9 | Folder 860 | September 13, 1990. North elevation |
Box 9 | Folder 861 | September 13, 1990. East elevation |
Box 9 | Folder 862 | September 13, 1990. West elevation |
Box 9 | Folder 863 | September 13, 1990. South west corner, elevation |
Box 9 | Folder 864 | September 13, 1990. South east corner, elevation |
Box 9 | Folder 865 | September 26, 1990. East elevation |
Box 9 | Folder 866 | September 26, 1990. West elevation |
Box 9 | Folder 867 | September 26, 1990. North elevation |
Box 9 | Folder 868 | September 26, 1990. South half roof |
Box 9 | Folder 869 | September 26, 1990. North half roof |
Box 9 | Folder 870 | September 26, 1990. South east corner, elevation |
Box 9 | Folder 871 | September 26, 1990. Lower level, audio-visual studio |
Box 9 | Folder 872 | September 26, 1990. Lower level, corridor |
Box 9 | Folder 873 | September 26, 1990. Lower level, mechanical equipment |
Box 9 | Folder 874 | September 26, 1990. Ground level, main lobby drywall |
Box 9 | Folder 875 | September 26, 1990. Ground level, south corridor |
Box 9 | Folder 876 | September 26, 1990. Congress Parkway, site work |
Box 9 | Folder 877 | September 26, 1990. Third level, looking south |
Box 9 | Folder 878 | September 26, 1990. Third level, top of escalators |
Box 9 | Folder 879 | September 26, 1990. Third level, terrazzo |
Box 9 | Folder 880 | September 26, 1990. Third level, arched window |
Box 9 | Folder 881 | September 26, 1990. Fourth level, looking north east |
Box 9 | Folder 882 | September 26, 1990. Fifth level, elevator lobby |
Box 9 | Folder 883 | September 26, 1990. Fifth level, south elevation, brick |
Box 9 | Folder 884 | September 26, 1990. Sixth level, corridor terrazzo |
Box 9 | Folder 885 | September 26, 1990. Sixth level, east alcoves |
Box 9 | Folder 886 | September 26, 1990. Seventh level, escalator railings |
Box 9 | Folder 887 | September 26, 1990. Eighth level, lobby ceiling |
Box 9 | Folder 888 | September 26, 1990. Eighth level, block back-up |
Box 9 | Folder 889 | September 26, 1990. Ninth level, looking at north east corner |
Box 9 | Folder 890 | September 26, 1990. Ninth level, south west family room |
Box 9 | Folder 891 | September 26, 1990. Tenth level, west pediment wall glass |
Box 9 | Folder 892 | September 26, 1990. Tenth level, inter block |
Box 9 | Folder 893 | September 26, 1990. Tenth level, looking down at Winter Garden scaffolding |
Box 9 | Folder 894 | September 26, 1990. South east corner of roof |
Box 9 | Folder 895 | September 26, 1990. East barrel roof |
Box 9 | Folder 896 | September 26, 1990. Second level, Children’s Library |
Box 9 | Folder 897 | September 26, 1990. Fourth level, looking east |
Box 9 | Folder 898 | October 12, 1990. Lower level, water lines welding |
Box 9 | Folder 899 | October 12, 1990. Lower level, chiller control panel |
Box 9 | Folder 900 | October 12, 1990. Mezzanine, Smart Room, raised floor |
Box 10 | Folder 901 | October 12, 1990. Ground level, elevator lobby lights |
Box 10 | Folder 902 | October 12, 1990. Exterior curtain wall molding |
Box 10 | Folder 903 | October 12, 1990. Ground level, pull heating and wire |
Box 10 | Folder 904 | October 12, 1990. Exterior granite work |
Box 10 | Folder 905 | October 12, 1990. Main entrance, door frame |
Box 10 | Folder 906 | October 12, 1990. Second level, lobby ceiling plaster |
Box 10 | Folder 907 | October 12, 1990. Second level, hydraulic elevator |
Box 10 | Folder 908 | October 12, 1990. Third level, wire mesh at elevator |
Box 10 | Folder 909 | October 12, 1990. Third level, setting sprinkler head |
Box 10 | Folder 910 | October 12, 1990. Fourth level, escalator framing |
Box 10 | Folder 911 | October 12, 1990. Fourth level, light fixtures |
Box 10 | Folder 912 | October 12, 1990. Fifth level, ceiling plaster molding |
Box 10 | Folder 913 | October 12, 1990. Fifth level, alcove drywall |
Box 10 | Folder 914 | October 12, 1990. Sixth level, setting sprinkler heads |
Box 10 | Folder 915 | October 12, 1990. Sixth level, terrazzo |
Box 10 | Folder 916 | October 12, 1990. Seventh level, elevator door butts |
Box 10 | Folder 917 | October 12, 1990. Seventh level, terrazzo cove base |
Box 10 | Folder 918 | October 12, 1990. Eighth level, vaulted ceiling |
Box 10 | Folder 919 | October 12, 1990. Eighth level, exterior stone setting |
Box 10 | Folder 920 | October 12, 1990. Ninth level, cooling coil piping |
Box 10 | Folder 921 | October 12, 1990. Ninth level, drywall |
Box 10 | Folder 922 | October 12, 1990. Tenth level, window glazing |
Box 10 | Folder 923 | October 12, 1990. Tenth level, pipe cutting for MCC |
Box 10 | Folder 924 | October 12, 1990. South half of roof |
Box 10 | Folder 925 | October 12, 1990. North half of roof |
Box 10 | Folder 926 | October 12, 1990. North elevation |
Box 10 | Folder 927 | October 12, 1990. East elevation |
Box 10 | Folder 928 | October 12, 1990. West elevation |
Box 10 | Folder 929 | October 12, 1990. South elevation |
Box 10 | Folder 930 | October 12, 1990. South east corner, elevation |
Box 10 | Folder 931 | October 25, 1990. South east corner, elevation |
Box 10 | Folder 932 | October 25, 1990. North elevation |
Box 10 | Folder 933 | October 25, 1990. Cornice welding |
Box 10 | Folder 934 | October 25, 1990. Cornice arch |
Box 10 | Folder 935 | October 25, 1990. Tenth level, painting barrel arches |
Box 10 | Folder 936 | October 25, 1990. Tenth level, metal studs |
Box 10 | Folder 937 | October 25, 1990. Ninth level, water pipe cover sealer |
Box 10 | Folder 938 | October 25, 1990. Ninth level, metal stud insulation |
Box 10 | Folder 939 | October 25, 1990. Ninth level, entrance pediment stut framing |
Box 10 | Folder 940 | October 25, 1990. Eighth level, escalator installation |
Box 10 | Folder 941 | October 25, 1990. Eighth level, glazer |
Box 10 | Folder 942 | October 25, 1990. Seventh level, brick work |
Box 10 | Folder 943 | October 25, 1990. Seventh level, north east corner, ceiling grid |
Box 10 | Folder 944 | October 25, 1990. Sixth level, terrazzo |
Box 10 | Folder 945 | October 25, 1990. Sixth level, stone work |
Box 10 | Folder 946 | October 25, 1990. Fifth level, escalator framing |
Box 10 | Folder 947 | October 25, 1990. Fifth level, reading room |
Box 10 | Folder 948 | October 25, 1990. Ninth level, stairwell drywall |
Box 10 | Folder 949 | October 25, 1990. Fourth level |
Box 10 | Folder 950 | October 25, 1990. Third level, terrazzo |
Box 10 | Folder 951 | October 25, 1990. Second level, drywall standing |
Box 10 | Folder 952 | October 25, 1990. Second level, general view of GFRG |
Box 10 | Folder 953 | October 25, 1990. Second level, pulling floor cell wire |
Box 10 | Folder 954 | October 25, 1990. Ground level, main entrance, plastering |
Box 10 | Folder 955 | October 25, 1990. Ground level, caulking at arch window |
Box 10 | Folder 956 | October 25, 1990. Ground level, fire alarm |
Box 10 | Folder 957 | October 25, 1990. Lower level, plastering at main lobby |
Box 10 | Folder 958 | October 25, 1990. Exterior, south end, preparation for sidewalk |
Box 10 | Folder 959 | October 25, 1990. Ground level, auditorium cat-walk |
Box 10 | Folder 960 | October 25, 1990. West elevation |
Box 10 | Folder 961 | October 25, 1990. North half of roof |
Box 10 | Folder 962 | October 25, 1990. South half of roof |
Box 10 | Folder 963 | October 25, 1990. East elevation |
Box 10 | Folder 964 | November 8, 1990. North elevation, north west corner |
Box 10 | Folder 965 | November 8, 1990. North elevation |
Box 10 | Folder 966 | November 8, 1990. East elevation |
Box 10 | Folder 967 | November 8, 1990. South east corner |
Box 10 | Folder 968 | November 8, 1990. South elevation |
Box 10 | Folder 969 | November 8, 1990. West elevation |
Box 10 | Folder 970 | November 8, 1990. South east corner of roof |
Box 10 | Folder 971 | November 8, 1990. Tenth level, east side of Winter Garden bridge |
Box 10 | Folder 972 | November 8, 1990. Ninth level, south west corner of Winter Garden, GFRG molding |
Box 10 | Folder 973 | November 8, 1990. Tenth level, Winter Garden |
Box 10 | Folder 974 | November 8, 1990. Ninth level, west, hanging sheet rock |
Box 10 | Folder 975 | November 8, 1990. Eighth level, ceiling grid and terrazzo installation |
Box 10 | Folder 976 | November 8, 1990. Seventh level, arch of arch curtain wall |
Box 10 | Folder 977 | November 8, 1990. South elevation, setting festoon and swags |
Box 10 | Folder 978 | November 8, 1990. Seventh level, south elevation, brick work on arch |
Box 10 | Folder 979 | November 8, 1990. Sixth level, grinding terrazzo, plastering, reading room |
Box 10 | Folder 980 | November 8, 1990. Sixth level, plastering wall, elevator doors installed |
Box 10 | Folder 981 | November 8, 1990. Fifth level, cleaning up elevator doors |
Box 10 | Folder 982 | November 8, 1990. Fifth level, cutting sprinkler pipe, installing light fixtures |
Box 10 | Folder 983 | November 8, 1990. Fourth level, carpet installation, acoustical tile in |
Box 10 | Folder 984 | November 8, 1990. Fourth level, installing trim |
Box 10 | Folder 985 | November 8, 1990. Third level, testing sprinkler pipes |
Box 10 | Folder 986 | November 8, 1990. Third level, acoustical tile |
Box 10 | Folder 987 | November 8, 1990. Second level, making ornamental decorative trim |
Box 10 | Folder 988 | November 8, 1990. Second level, marble ledge piece |
Box 10 | Folder 989 | November 8, 1990. Second level, installing mobile system library rails |
Box 10 | Folder 990 | November 8, 1990. Ground level, east side, finish plaster, arch |
Box 10 | Folder 991 | November 8, 1990. Ground level, west side auditorium, blocking in |
Box 10 | Folder 992 | November 8, 1990. Lower level, room east of auditorium |
Box 10 | Folder 993 | November 8, 1990. Lower level, multipurpose room, acoustic grid work |
Box 10 | Folder 994 | November 8, 1990. North half of roof |
Box 10 | Folder 995 | November 8, 1990. South half of roof |
Box 10 | Folder 996 | November 8, 1990. Exterior, north ground level, archway |
Box 10 | Folder 997 | November 21, 1990. Tenth level |
Box 10 | Folder 998 | November 21, 1990. Ninth level, exterior walkway |
Box 10 | Folder 999 | November 21, 1990. Ninth level, north corridor |
Box 10 | Folder 1000 | November 21, 1990. Ninth level, Winter Garden |
Box 11 | Folder 1001 | November 21, 1990. Eighth level, terrazzo |
Box 11 | Folder 1002 | November 21, 1990. Eighth level, escalator landing |
Box 11 | Folder 1003 | November 21, 1990. Seventh level, south west corner, brick arch |
Box 11 | Folder 1004 | November 21, 1990. Seventh level, east corridor |
Box 11 | Folder 1005 | November 21, 1990. Seventh level, looking at north east corner |
Box 11 | Folder 1006 | November 21, 1990. Sixth level, looking north |
Box 11 | Folder 1007 | November 21, 1990. Sixth level, escalator landing |
Box 11 | Folder 1008 | November 21, 1990. Fifth level, compact storage |
Box 11 | Folder 1009 | November 21, 1990. Fifth level, escalator lobby |
Box 11 | Folder 1010 | November 21, 1990. Fourth level, north corridor |
Box 11 | Folder 1011 | November 21, 1990. Fourth level, wood trim |
Box 11 | Folder 1012 | November 21, 1990. Fourth level, alcove stone |
Box 11 | Folder 1013 | November 21, 1990. Third level |
Box 11 | Folder 1014 | November 21, 1990. Third level, escalator landing |
Box 11 | Folder 1015 | November 21, 1990. Second level, elevator lobby stone |
Box 11 | Folder 1016 | November 21, 1990. Second level, complex lobby |
Box 11 | Folder 1017 | November 21, 1990. Second level, lobby ceiling |
Box 11 | Folder 1018 | November 21, 1990. Second level, lobby window |
Box 11 | Folder 1019 | November 21, 1990. Second level, Children’s Library |
Box 11 | Folder 1020 | November 21, 1990. Lower level, TC/AV studio |
Box 11 | Folder 1021 | November 21, 1990. Ground level, east |
Box 11 | Folder 1022 | November 21, 1990. Ground level, corridor |
Box 11 | Folder 1023 | November 21, 1990. East elevation |
Box 11 | Folder 1024 | November 21, 1990. North elevation |
Box 11 | Folder 1025 | November 21, 1990. North half of roof |
Box 11 | Folder 1026 | November 21, 1990. South half of roof |
Box 11 | Folder 1027 | November 21, 1990. West elevation |
Box 11 | Folder 1028 | November 21, 1990. South elevation |
Box 11 | Folder 1029 | November 21, 1990. South east corner, elevation |
Box 11 | Folder 1030 | December 13, 1990. South east corner, elevation |
Box 11 | Folder 1031 | December 13, 1990. East elevation |
Box 11 | Folder 1032 | December 13, 1990. East elevation, mid-section |
Box 11 | Folder 1033 | December 13, 1990. Stonework, south elevation |
Box 11 | Folder 1034 | December 13, 1990. South elevation |
Box 11 | Folder 1035 | December 13, 1990. West elevation |
Box 11 | Folder 1036 | December 13, 1990. West elevation |
Box 11 | Folder 1037 | December 13, 1990. Auditorium |
Box 11 | Folder 1038 | December 13, 1990. Lower level, complex lobby |
Box 11 | Folder 1039 | December 13, 1990. Ground level, south corridor |
Box 11 | Folder 1040 | December 13, 1990. Ground level, north east corridor |
Box 11 | Folder 1041 | December 13, 1990. Second level, Children’s Library |
Box 11 | Folder 1042 | December 13, 1990. Second level, complex lobby |
Box 11 | Folder 1043 | December 13, 1990. Third level, east escalator lobby |
Box 11 | Folder 1044 | December 13, 1990. Third level, escalator enclosure |
Box 11 | Folder 1045 | December 13, 1990. Fourth level, north, arched window |
Box 11 | Folder 1046 | December 13, 1990. Fourth level, reading alcoves |
Box 11 | Folder 1047 | December 13, 1990. Fourth level, reference desk |
Box 11 | Folder 1048 | December 13, 1990. Fifth level, reading room |
Box 11 | Folder 1049 | December 13, 1990. Fifth level, north side, glass installation |
Box 11 | Folder 1050 | December 13, 1990. Sixth level, east alcove, stone installation |
Box 11 | Folder 1051 | December 13, 1990. Sixth level, millwork |
Box 11 | Folder 1052 | December 13, 1990. Seventh level, south side, arched window framing |
Box 11 | Folder 1053 | December 13, 1990. Seventh level, east alcove, plaster |
Box 11 | Folder 1054 | December 13, 1990. Eighth level, elevator lobby |
Box 11 | Folder 1055 | December 13, 1990. Eighth level, east corridor |
Box 11 | Folder 1056 | December 13, 1990. Ninth level, east balcony |
Box 11 | Folder 1057 | December 13, 1990. Ninth level, Winter Garden |
Box 11 | Folder 1058 | December 13, 1990. Ninth level, north elevation, Winter Garden |
Box 11 | Folder 1059 | December 13, 1990. Ninth level, Winter Garden lights |
Box 11 | Folder 1060 | December 13, 1990. South east corner of roof |
Box 11 | Folder 1061 | December 13, 1990. South half of roof |
Box 11 | Folder 1062 | December 13, 1990. North half of roof |
Box 11 | Folder 1063 | December 28, 1990. Ninth level, north east corner, wall framing |
Box 11 | Folder 1064 | December 28, 1990. Ninth level, north west corner, Winter Garden |
Box 11 | Folder 1065 | December 28, 1990. Ninth level, east, Winter Garden |
Box 11 | Folder 1066 | December 28, 1990. Ninth level, escalator north |
Box 11 | Folder 1067 | December 28, 1990. S. rest ground floor on balconies |
Box 11 | Folder 1068 | December 28, 1990. Eighth level, east hallway ceiling |
Box 11 | Folder 1069 | December 28, 1990. Eighth level, escalator enclosure |
Box 11 | Folder 1070 | December 28, 1990. Eighth level, platform for shelving system |
Box 11 | Folder 1071 | December 28, 1990. Seventh level, north, arch window |
Box 11 | Folder 1072 | December 28, 1990. Seventh level, plastering east reading alcove |
Box 11 | Folder 1073 | December 28, 1990. Seventh level, meeting room, plaster and frame |
Box 11 | Folder 1074 | December 28, 1990. Seventh level, finishing terrazzo |
Box 11 | Folder 1075 | December 28, 1990. Sixth level, door hardware installation |
Box 11 | Folder 1076 | December 28, 1990. Sixth level, two-story reading alcove |
Box 11 | Folder 1077 | December 28, 1990. Sixth level, reading alcove |
Box 11 | Folder 1078 | December 28, 1990. Sixth level, south, glazing arch window |
Box 11 | Folder 1079 | December 28, 1990. Sixth level, support post for reception desk |
Box 11 | Folder 1080 | December 28, 1990. Fifth level, wood base installation |
Box 11 | Folder 1081 | December 28, 1990. Fifth level, bookshelf installation |
Box 11 | Folder 1082 | December 28, 1990. Fifth level, compact shelving installation |
Box 11 | Folder 1083 | December 28, 1990. Fifth level, touchup ceiling taping |
Box 11 | Folder 1084 | December 28, 1990. Fifth level, chair rail installation |
Box 11 | Folder 1085 | December 28, 1990. Fourth level, reception desk assembly |
Box 11 | Folder 1086 | December 28, 1990. Bathroom fixtures and partitions |
Box 11 | Folder 1087 | December 28, 1990. Fourth level, marble wainscot installation |
Box 11 | Folder 1088 | December 28, 1990. Third level, escalator enclosure, maple |
Box 11 | Folder 1089 | December 28, 1990. Third level, escalator lobby |
Box 11 | Folder 1090 | December 28, 1990. Second level, carpet installation |
Box 11 | Folder 1091 | December 28, 1990. Mezzanine looking down to grand lobby |
Box 11 | Folder 1092 | December 28, 1990. Ground level, grand lobby looking up |
Box 11 | Folder 1093 | December 28, 1990. West elevation |
Box 11 | Folder 1094 | December 28, 1990. North elevation |
Box 11 | Folder 1095 | December 28, 1990. East elevation |
Box 11 | Folder 1096 | December 28, 1990. South east corner, elevation |
Box 11 | Folder 1097 | December 28, 1990. South elevation |
Box 11 | Folder 1098 | December 28, 1990. South west corner, elevation |
Box 11 | Folder 1099 | December 28, 1990. South west corner, elevation |
Box 11 | Folder 1100 | December 28, 1990. South half of roof |
Box 12 | Folder 1101 | December 28, 1990. North half of roof |
Box 12 | Folder 1102 | January 17, 1991. Lower level, audio/visual auditorium |
Box 12 | Folder 1103 | January 17, 1991. Lower level, auditorium |
Box 12 | Folder 1104 | January 17, 1991. Lower level, complex lobby |
Box 12 | Folder 1105 | January 17, 1991. Ground level, north east corridor |
Box 12 | Folder 1106 | January 17, 1991. Ground level, complex lobby |
Box 12 | Folder 1107 | January 17, 1991. Ground level, south corridor |
Box 12 | Folder 1108 | January 17, 1991. Second level, north end |
Box 12 | Folder 1109 | January 17, 1991. Second level, south end |
Box 12 | Folder 1110 | January 17, 1991. Third level, escalator lobby |
Box 12 | Folder 1111 | January 17, 1991. Third level, east window finishes |
Box 12 | Folder 1112 | January 17, 1991. Fourth level, escalator enclosure |
Box 12 | Folder 1113 | January 17, 1991. Fourth level, reading room |
Box 12 | Folder 1114 | January 17, 1991. Fifth level, circulation desk |
Box 12 | Folder 1115 | January 17, 1991. Fifth level |
Box 12 | Folder 1116 | January 17, 1991. Sixth level |
Box 12 | Folder 1117 | January 17, 1991. Sixth level, reading carrel |
Box 12 | Folder 1118 | January 17, 1991. Seventh level, east corridor |
Box 12 | Folder 1119 | January 17, 1991. Seventh level, Author’s Room |
Box 12 | Folder 1120 | January 17, 1991. Eighth level, circulation desk |
Box 12 | Folder 1121 | January 17, 1991. Eighth level, west wall |
Box 12 | Folder 1122 | January 17, 1991. Tenth level, looking down into Winter Garden |
Box 12 | Folder 1123 | January 17, 1991. Ninth level, elevator lobby |
Box 12 | Folder 1124 | January 17, 1991. Tenth level, bathroom walls |
Box 12 | Folder 1125 | January 17, 1991. Tenth level, looking down into Winter Garden |
Box 12 | Folder 1126 | January 17, 1991. Elevator room |
Box 12 | Folder 1127 | January 17, 1991. North mechanical room |
Box 12 | Folder 1128 | January 17, 1991. North half of roof |
Box 12 | Folder 1129 | January 17, 1991. South half of roof |
Box 12 | Folder 1130 | January 17, 1991. North elevation |
Box 12 | Folder 1131 | January 17, 1991. East elevation |
Box 12 | Folder 1132 | January 17, 1991. South elevation |
Box 12 | Folder 1133 | January 17, 1991. West elevation |
Box 12 | Folder 1134 | January 17, 1991. South east corner, elevation |
Box 12 | Folder 1135 | January 31, 1991. North elevation |
Box 12 | Folder 1136 | January 31, 1991. South east corner roof line |
Box 12 | Folder 1137 | January 31, 1991. East elevation |
Box 12 | Folder 1138 | January 31, 1991. South east corner elevation |
Box 12 | Folder 1139 | January 31, 1991. South elevation |
Box 12 | Folder 1140 | January 31, 1991. West elevation |
Box 12 | Folder 1141 | January 31, 1991. Tenth level, north elevator lobby |
Box 12 | Folder 1142 | January 31, 1991. Winter Garden looking east |
Box 12 | Folder 1143 | January 31, 1991. Tenth level, south east, duct work installation |
Box 12 | Folder 1144 | January 31, 1991. Tenth level, bridge looking north |
Box 12 | Folder 1145 | January 31, 1991. Tenth level, looking down into Winter Garden, plastering |
Box 12 | Folder 1146 | January 31, 1991. Tenth level, looking down into Winter Garden, marble installation |
Box 12 | Folder 1147 | January 31, 1991. Ninth level, east corridor GFRG installation |
Box 12 | Folder 1148 | January 31, 1991. Eighth level, east wall rocked |
Box 12 | Folder 1149 | January 31, 1991. Seventh level, escalator bank |
Box 12 | Folder 1150 | January 31, 1991. Eighth and ninth levels, escalator enclosure |
Box 12 | Folder 1151 | January 31, 1991. Seventh level, study alcove |
Box 12 | Folder 1152 | January 31, 1991. Sixth level, block stacks, tables, column finishing |
Box 12 | Folder 1153 | January 31, 1991. Sixth level, modular furniture installation |
Box 12 | Folder 1154 | January 31, 1991. Fifth level, desk installation |
Box 12 | Folder 1155 | January 31, 1991. Terrazzo |
Box 12 | Folder 1156 | January 31, 1991. Fourth level, south |
Box 12 | Folder 1157 | January 31, 1991. Two-story reading alcove ceiling |
Box 12 | Folder 1158 | January 31, 1991. North alcove |
Box 12 | Folder 1159 | January 31, 1991. Third level, marble wainscot |
Box 12 | Folder 1160 | January 31, 1991. Escalator handrail installation |
Box 12 | Folder 1161 | January 31, 1991. Third level, reference desk |
Box 12 | Folder 1162 | January 31, 1991. Mezzanine, looking down to north end of main lobby |
Box 12 | Folder 1163 | January 31, 1991. Second level, Children’s Library |
Box 12 | Folder 1164 | January 31, 1991. Lower level, lobby |
Box 12 | Folder 1165 | January 31, 1991. Ground level, main entry doors |
Box 12 | Folder 1166 | January 31, 1991. North half of roof |
Box 12 | Folder 1167 | January 31, 1991. South half of roof |
Box 12 | Folder 1168 | February 18, 1991. Tenth level, south east corner, drywall |
Box 12 | Folder 1169 | February 18, 1991. Tenth level, bridge looking north |
Box 12 | Folder 1170 | February 18, 1991. Tenth level, Winter Garden looking south west |
Box 12 | Folder 1171 | February 18, 1991. Tenth level, north, stud work |
Box 12 | Folder 1172 | February 18, 1991. Tenth level, elevator lobby |
Box 12 | Folder 1173 | February 18, 1991. Tenth level, service corridor ceiling work |
Box 12 | Folder 1174 | February 18, 1991. Ninth level, elevator lobby |
Box 12 | Folder 1175 | February 18, 1991. Ninth level, Winter Garden looking south east |
Box 12 | Folder 1176 | February 18, 1991. Ninth level, Winter Garden looking north west |
Box 12 | Folder 1177 | February 18, 1991. Ninth level, public restaurant, looking south west |
Box 12 | Folder 1178 | February 18, 1991. Ninth level, south west mechanical room |
Box 12 | Folder 1179 | February 18, 1991. Ninth level, staff lounge |
Box 12 | Folder 1180 | February 18, 1991. Eighth level, north, closed stack area |
Box 12 | Folder 1181 | February 18, 1991. Eighth level, south reference desk |
Box 12 | Folder 1182 | February 18, 1991. Eighth level, south, stack area |
Box 12 | Folder 1183 | February 18, 1991. Eighth level, south, compact shelving |
Box 12 | Folder 1184 | February 18, 1991. Eighth level, north escalator down to seventh level |
Box 12 | Folder 1185 | February 18, 1991. Eighth level, elevator/escalator lobby |
Box 12 | Folder 1186 | February 18, 1991. Seventh level, south perimeter looking east |
Box 12 | Folder 1187 | February 18, 1991. Seventh level, north, stack area |
Box 12 | Folder 1188 | February 18, 1991. Seventh level, Chicago Authors’ Room |
Box 12 | Folder 1189 | February 18, 1991. Seventh level, north reference desk |
Box 12 | Folder 1190 | February 18, 1991. Seventh level, north escalators |
Box 12 | Folder 1191 | February 18, 1991. Seventh level, alcove, looking north east |
Box 12 | Folder 1192 | February 18, 1991. Sixth level, north perimeter looking north |
Box 12 | Folder 1193 | February 18, 1991. Sixth level, east reading alcove |
Box 12 | Folder 1194 | February 18, 1991. Sixth level, center corridor looking west |
Box 12 | Folder 1195 | February 18, 1991. Elevator lobby, looking north |
Box 12 | Folder 1196 | February 18, 1991. Sixth level, north, staff area |
Box 12 | Folder 1197 | February 18, 1991. Sixth level, service corridor looking south |
Box 12 | Folder 1198 | February 18, 1991. Fifth level, east perimeter corridor, looking north |
Box 12 | Folder 1199 | February 18, 1991. Fifth level, stack/reading area east of escalator |
Box 12 | Folder 1200 | February 18, 1991. Fifth level, north, closed reading area |
Box 13 | Folder 1201 | February 18, 1991. Fourth level, north half of service corridor |
Box 13 | Folder 1202 | February 18, 1991. Fourth level, north perimeter corridor, looking south east |
Box 13 | Folder 1203 | February 18, 1991. Fourth level, east reading alcove |
Box 13 | Folder 1204 | February 18, 1991. Fourth level, reading center, looking west |
Box 13 | Folder 1205 | February 18, 1991. Fourth level, two-story reading alcove |
Box 13 | Folder 1206 | February 18, 1991. Fourth level, north reference desk, looking north |
Box 13 | Folder 1207 | February 18, 1991. Third level, south reference desk, looking south west |
Box 13 | Folder 1208 | February 18, 1991. Third level, south east, staff area |
Box 13 | Folder 1209 | February 18, 1991. Third level, north perimeter corridor, looking west |
Box 13 | Folder 1210 | February 18, 1991. Third level, floor entrance, book detectors |
Box 13 | Folder 1211 | February 18, 1991. Third level, elevator lobby from escalator |
Box 13 | Folder 1212 | February 18, 1991. Second level, main lobby ceiling |
Box 13 | Folder 1213 | February 18, 1991. Second level, Children’s Library, stacks |
Box 13 | Folder 1214 | February 18, 1991. Mezzanine level, looking down to north east of main lobby |
Box 13 | Folder 1215 | February 18, 1991. Second level, elevator lobby, looking north |
Box 13 | Folder 1216 | February 18, 1991. Second level, compact shelving |
Box 13 | Folder 1217 | February 18, 1991. Ground level, Congress Corridor, looking north |
Box 13 | Folder 1218 | February 18, 1991. Ground level, main lobby, north escalator |
Box 13 | Folder 1219 | February 18, 1991. Ground level, main lobby, looking south east |
Box 13 | Folder 1220 | February 18, 1991. Ground level, corridor north to Van Buren |
Box 13 | Folder 1221 | February 18, 1991. Ground level, parking area, looking south |
Box 13 | Folder 1222 | February 18, 1991. Lower level, auditorium |
Box 13 | Folder 1223 | February 18, 1991. Lower level, mechanical room looking east |
Box 13 | Folder 1224 | February 18, 1991. North half of roof |
Box 13 | Folder 1225 | February 18, 1991. South half of roof |
Box 13 | Folder 1226 | February 18, 1991. North elevation |
Box 13 | Folder 1227 | February 18, 1991. East elevation |
Box 13 | Folder 1228 | February 18, 1991. South elevation |
Box 13 | Folder 1229 | February 18, 1991. West elevation |
Box 13 | Folder 1230 | February 18, 1991. South east corner, elevation |
Box 13 | Folder 1231 | February 18, 1991. South west corner, elevation |
Box 13 | Folder 1232 | February 18, 1991. North west corner, elevation |
Box 13 | Folder 1233 | February 18, 1991. North east corner, elevation |
Box 13 | Folder 1234 | February 28, 1991. Tenth level, tenant duct work |
Box 13 | Folder 1235 | February 28, 1991. Tenth level, tenant drywall work |
Box 13 | Folder 1236 | February 28, 1991. Ninth level, looking down into Winter Garden, marble terrazzo |
Box 13 | Folder 1237 | February 28, 1991. Tenth level, looking down into Winter Garden, marble terrazzo |
Box 13 | Folder 1238 | February 28, 1991. Ninth level, added smoke detectors for corridors |
Box 13 | Folder 1239 | February 28, 1991. Tenth level, tenant drywall |
Box 13 | Folder 1240 | February 28, 1991. Tenth level, tenant sprinkler |
Box 13 | Folder 1241 | February 28, 1991. Ninth level, installing ceiling tile |
Box 13 | Folder 1242 | February 28, 1991. Ninth level, exterior, north west acroteria corner |
Box 13 | Folder 1243 | February 28, 1991. Ninth/tenth levels, north east acroteria corner |
Box 13 | Folder 1244 | February 28, 1991. Ninth/tenth levels, south east acroteria corner |
Box 13 | Folder 1245 | February 28, 1991. Pork chop detail work |
Box 13 | Folder 1246 | February 28, 1991. Ninth/tenth levels, south west acroteria corner |
Box 13 | Folder 1247 | February 28, 1991. Eighth level, south west compact shelving |
Box 13 | Folder 1248 | February 28, 1991. Eighth level, south west millwork |
Box 13 | Folder 1249 | February 28, 1991. Eighth level, south escalator cladding |
Box 13 | Folder 1250 | February 28, 1991. Eighth level, north |
Box 13 | Folder 1251 | February 28, 1991. Eighth level, north shelving |
Box 13 | Folder 1252 | February 28, 1991. Eighth level, looking south east |
Box 13 | Folder 1253 | February 28, 1991. Eighth level, north shelving |
Box 13 | Folder 1254 | February 28, 1991. Eighth level, elevator lobby |
Box 13 | Folder 1255 | February 28, 1991. Seventh level, reference desk |
Box 13 | Folder 1256 | February 28, 1991. Seventh level, women’s bathroom |
Box 13 | Folder 1257 | February 28, 1991. Seventh level, south west compact shelving |
Box 13 | Folder 1258 | February 28, 1991. Seventh level, south, millwork display cases |
Box 13 | Folder 1259 | February 28, 1991. Seventh level, language laboratory TVAC |
Box 13 | Folder 1260 | February 28, 1991. Seventh level, Chicago Authors’ Room |
Box 13 | Folder 1261 | February 28, 1991. Seventh level, north east shelving |
Box 13 | Folder 1262 | February 28, 1991. Seventh level, reading alcove |
Box 13 | Folder 1263 | February 28, 1991. Seventh level, reading alcove |
Box 13 | Folder 1264 | February 28, 1991. Seventh level, north west stair, drywall replacement |
Box 13 | Folder 1265 | February 28, 1991. Seventh level, north corridor |
Box 13 | Folder 1266 | February 28, 1991. Seventh level, north west staff area |
Box 13 | Folder 1267 | February 28, 1991. Seventh level, north west, staff office |
Box 13 | Folder 1268 | February 28, 1991. Seventh level, west service corridor |
Box 13 | Folder 1269 | February 28, 1991. Sixth level, north corridor |
Box 13 | Folder 1270 | February 28, 1991. Sixth level, west corridor |
Box 13 | Folder 1271 | February 28, 1991. Sixth level, north shelving |
Box 13 | Folder 1272 | February 28, 1991. Sixth level, two-story reading alcove |
Box 13 | Folder 1273 | February 28, 1991. Sixth level, elevator lobby |
Box 13 | Folder 1274 | February 28, 1991. Sixth level, reference desk |
Box 13 | Folder 1275 | February 28, 1991. Sixth level, south, arched window |
Box 13 | Folder 1276 | February 28, 1991. Sixth level, east corridor |
Box 13 | Folder 1277 | February 28, 1991. Sixth level, south single closet |
Box 13 | Folder 1278 | February 28, 1991. Sixth level, north west, staff area |
Box 13 | Folder 1279 | February 28, 1991. Sixth level, elevator lobby |
Box 13 | Folder 1280 | February 28, 1991. Fifth level, microfilm room |
Box 13 | Folder 1281 | February 28, 1991. Fifth level, microfilm room, glazing |
Box 13 | Folder 1282 | February 28, 1991. Fifth level, north corridor |
Box 13 | Folder 1283 | February 28, 1991. Fifth level, north single closet |
Box 13 | Folder 1284 | February 28, 1991. Fifth level, north, reading area |
Box 13 | Folder 1285 | February 28, 1991. Fifth level, east corridor |
Box 13 | Folder 1286 | February 28, 1991. Fifth level, center corridor |
Box 13 | Folder 1287 | February 28, 1991. Fifth level, compact shelving, testing and balancing |
Box 13 | Folder 1288 | February 28, 1991. Fifth level, south, testing and balancing |
Box 13 | Folder 1289 | February 28, 1991. Fifth level, south, staff area |
Box 13 | Folder 1290 | February 28, 1991. Fifth level, elevator lobby |
Box 13 | Folder 1291 | February 28, 1991. Fifth level, west elevator closet |
Box 13 | Folder 1292 | February 28, 1991. Fifth level, west single closet |
Box 13 | Folder 1293 | February 28, 1991. Fourth level, microfilm room |
Box 13 | Folder 1294 | February 28, 1991. Fourth level, south |
Box 13 | Folder 1295 | February 28, 1991. Fourth level, reading alcove |
Box 13 | Folder 1296 | February 28, 1991. Fourth level, center corridor |
Box 13 | Folder 1297 | February 28, 1991. Fourth level, north west reading area |
Box 13 | Folder 1298 | February 28, 1991. Fourth level, staff area |
Box 13 | Folder 1299 | February 28, 1991. Fourth level, electrical closet |
Box 13 | Folder 1300 | February 28, 1991. Fourth level, west single closet |
Box 14 | Folder 1301 | February 28, 1991. Fourth level, west corridor, painting prep. Work |
Box 14 | Folder 1302 | February 28, 1991. Fourth level, reference desk |
Box 14 | Folder 1303 | February 28, 1991. Third level, reference desk |
Box 14 | Folder 1304 | February 28, 1991. Third level, room 3N16, completing millwork after TCAV work |
Box 14 | Folder 1305 | February 28, 1991. Third level, dumb waiter |
Box 14 | Folder 1306 | February 28, 1991. Third level, north, staff area |
Box 14 | Folder 1307 | February 28, 1991. Third level, north corridor |
Box 14 | Folder 1308 | February 28, 1991. Third level, TVAC conduct run from room 3N16 to single closet |
Box 14 | Folder 1309 | February 28, 1991. Third level, escalator lobby |
Box 14 | Folder 1310 | February 28, 1991. Third level, south staff area |
Box 14 | Folder 1311 | February 28, 1991. Second level, Children’s Library |
Box 14 | Folder 1312 | February 28, 1991. Second level, TVAC multipurpose room |
Box 14 | Folder 1313 | February 28, 1991. Second level, south telephone cable |
Box 14 | Folder 1314 | February 28, 1991. Second level, west single closet |
Box 14 | Folder 1315 | February 28, 1991. Second level, elevator lobby |
Box 14 | Folder 1316 | February 28, 1991. Second level, north west corner |
Box 14 | Folder 1317 | February 28, 1991. Second level, CTA corridor |
Box 14 | Folder 1318 | February 28, 1991. Second level, north compact shelving |
Box 14 | Folder 1319 | February 28, 1991. Mezzanine looking down into main lobby |
Box 14 | Folder 1320 | February 28, 1991. Ground level, video room area |
Box 14 | Folder 1321 | February 28, 1991. Ground level, south corridor |
Box 14 | Folder 1322 | February 28, 1991. Ground level, elevator, west corridor |
Box 14 | Folder 1323 | February 28, 1991. Ground level, north dock area |
Box 14 | Folder 1324 | February 28, 1991. Ground level, north entry |
Box 14 | Folder 1325 | February 28, 1991. Ground level, TVAC battery racks |
Box 14 | Folder 1326 | February 28, 1991. Ground level, electrical closet |
Box 14 | Folder 1327 | February 28, 1991. Lower level, auditorium TCAV work |
Box 14 | Folder 1328 | February 28, 1991. Ground level, main entry |
Box 14 | Folder 1329 | February 28, 1991. Ground level, tenant area |
Box 14 | Folder 1330 | February 28, 1991. Exterior, south elevation and air intake/exhaust |
Box 14 | Folder 1331 | February 28, 1991. East elevation and air intake |
Box 14 | Folder 1332 | February 28, 1991. Lower level, lobby |
Box 14 | Folder 1333 | February 28, 1991. Lower level, multipurpose room, TCAV work |
Box 14 | Folder 1334 | February 28, 1991. Lower level, multipurpose room, TCAV work |
Box 14 | Folder 1335 | February 28, 1991. South mechanical room |
Box 14 | Folder 1336 | February 28, 1991. South mechanical room |
Box 14 | Folder 1337 | February 28, 1991. North east mechanical room |
Box 14 | Folder 1338 | February 28, 1991. North west mechanical room |
Box 14 | Folder 1339 | February 28, 1991. North half of roof |
Box 14 | Folder 1340 | February 28, 1991. South half of roof |
Box 14 | Folder 1341 | February 28, 1991. West elevation |
Box 14 | Folder 1342 | February 28, 1991. West elevation |
Box 14 | Folder 1343 | February 28, 1991. North elevation |
Box 14 | Folder 1344 | February 28, 1991. North elevation barrel |
Box 14 | Folder 1345 | February 28, 1991. North elevation |
Box 14 | Folder 1346 | February 28, 1991. East elevation |
Box 14 | Folder 1347 | February 28, 1991. East elevation barrel |
Box 14 | Folder 1348 | February 28, 1991. South east corner, elevation |
Box 14 | Folder 1349 | March 7, 1991. Ninth level, south east corner, room 95 TCAV |
Box 14 | Folder 1350 | March 7, 1991. Ninth level, north east corner, room 95 TCAV |
Box 14 | Folder 1351 | March 7, 1991. Ninth level, north west corner, room 95 TCAV |
Box 14 | Folder 1352 | March 7, 1991. Seventh level, Chicago Authors’ Room |
Box 14 | Folder 1353 | March 7, 1991. Third level, room 3N16, TCAV |
Box 14 | Folder 1354 | March 7, 1991. Lower level, multipurpose room, north wall, TCAV |
Box 14 | Folder 1355 | March 7, 1991. Lower level, multipurpose room. West wall, TCAV |
Box 14 | Folder 1356 | March 7, 1991. Lower level, multipurpose room, east wall, TCAV |
Box 14 | Folder 1357 | March 7, 1991. Lower level, south east corner, TCAV |
Box 14 | Folder 1358 | March 7, 1991. Lower level, west closet |
Box 14 | Folder 1359 | March 7, 1991. Lower level, TCAV |
Box 14 | Folder 1360 | March 7, 1991. Lower level, TCAV |
Box 14 | Folder 1361 | March 7, 1991. Lower level, east wall, west similar, TCAV |
Box 14 | Folder 1362 | March 7, 1991. Lower level, east wall, west similar, TCAV |
Box 14 | Folder 1363 | March 7, 1991. Lower level, stage, west wall, east similar |
Box 14 | Folder 1364 | March 7, 1991. Lower level, south, RF shielding room |
Box 14 | Folder 1365 | March 7, 1991. Lower level, north, RF shielding room, back area |
Box 14 | Folder 1366 | March 7, 1991. Lower level, small video auditorium, south wall |
Box 14 | Folder 1367 | March 7, 1991. Lower level, video auditorium, east wall |
Box 14 | Folder 1368 | March 14, 1991. Tenth level, tenant work elevator lobby |
Box 14 | Folder 1369 | March 14, 1991. Tenth level, tenant duct work relocation |
Box 14 | Folder 1370 | March 14, 1991. Tenth level, looking down into Winter Garden |
Box 14 | Folder 1371 | March 14, 1991. Tenth level, tenant work, south side |
Box 14 | Folder 1372 | March 14, 1991. Ninth level, missing sprinkler heads |
Box 14 | Folder 1373 | March 14, 1991. Ninth level, elevator lobby |
Box 14 | Folder 1374 | March 14, 1991. Ninth level, staff lounge |
Box 14 | Folder 1375 | March 14, 1991. Eighth level, missing millwork at elevator lobby |
Box 14 | Folder 1376 | March 14, 1991. Eighth level, missing light at east elevation |
Box 14 | Folder 1377 | March 14, 1991. Eighth level, millwork |
Box 14 | Folder 1378 | March 14, 1991. Eighth level, installing glass stops |
Box 14 | Folder 1379 | March 14, 1991. Eighth level, millwork installation |
Box 14 | Folder 1380 | March 14, 1991. Seventh level, Chicago Authors’ Room |
Box 14 | Folder 1381 | March 14, 1991. Fifth level, north reference desk |
Box 14 | Folder 1382 | March 14, 1991. Fourth level, room 4N10, TCAV |
Box 14 | Folder 1383 | March 14, 1991. Third level, north check-in desk |
Box 14 | Folder 1384 | March 14, 1991. Third level, dumbwaiter |
Box 14 | Folder 1385 | March 14, 1991. Second level, south west, 1BC cable |
Box 14 | Folder 1386 | March 14, 1991. Second level, toddler area |
Box 14 | Folder 1387 | March 14, 1991. Second level, children’s multipurpose room, TCAV |
Box 14 | Folder 1388 | March 14, 1991. Second level, Children’s Library, 6 foot high rooms |
Box 14 | Folder 1389 | March 14, 1991. Second level, CTA future connection |
Box 14 | Folder 1390 | March 14, 1991. Ground level, museum |
Box 14 | Folder 1391 | March 14, 1991. Ground level, film/video room |
Box 14 | Folder 1392 | March 14, 1991. Ground level, TCAV relocating battery panels |
Box 14 | Folder 1393 | March 14, 1991. Ground level, TCAV, east side of auditorium |
Box 14 | Folder 1394 | March 14, 1991. Lower level, auditorium |
Box 14 | Folder 1395 | March 14, 1991. Lower level, video auditorium TCAV work |
Box 14 | Folder 1396 | March 14, 1991. Lower level, south east, staff offices progress |
Box 14 | Folder 1397 | March 14, 1991. Lower level, room 0N20, TCAV work |
Box 14 | Folder 1398 | March 14, 1991. Lower level, TCAV in video studio |
Box 14 | Folder 1399 | March 14, 1991. Lower level, TCAV in video studio |
Box 14 | Folder 1400 | March 14, 1991. Lower level, progress of vinyl tile |
Box 14 | Folder 1401 | March 14, 1991. Lower level, TCAV in auditorium at the stage |
Box 14 | Folder 1402 | March 14, 1991. Lower level, TCAV in projection room |
Box 14 | Folder 1403 | March 14, 1991. Lower level, south mechanical room |
Box 14 | Folder 1404 | March 14, 1991. Lower level, mechanical room |
Box 14 | Folder 1405 | March 14, 1991. South east corner, elevation |
Box 14 | Folder 1406 | March 14, 1991. South elevation |
Box 14 | Folder 1407 | March 14, 1991. West elevation |
Box 14 | Folder 1408 | March 14, 1991. North half of roof |
Box 14 | Folder 1409 | March 14, 1991. South half of roof |
Box 14 | Folder 1410 | March 14, 1991. North elevation |
Box 14 | Folder 1411 | March 14, 1991. East elevation |