1-8 of 8 Matches
-
1. Chicago area expressway surveillance and control : final report
Category: state document
By: McDermott, Joseph M
Published: 1979
Call #: ILL TD 6.2: C 43
Series: Expressway surveillance rep
Language: English
-
2. Intermediate level of analysis for traffic improvement category
Category: local document
By: Chicago Ill
Published: 1964
Call #: Cc C94 1964a
Language: English
-
3. A Coordinated transportation approach to movement of people and goods during reconstruction of the Dan Ryan Expressway.
Category: local document
Published: 1990
Call #: Cx T78 1990i
Language: English
-
4. Dan Ryan traffic and accident study, Eisenhower Expressway to 31st Street : interim report to the Illinois Transportation Study Commission.
Category: state document
Published: 1979
Call #: ILL Y 3. T 69: 2 D 19
Language: English
-
5. Strategic regional arterial : Ohio/Ontario streets, Grand Avenue/Illinois Street from the Kennedy Expressway to Lake Shore Drive.
Category: state document
Published: 1993
Call #: Cz W .4000 S89 1993xb
Language: English
-
6. Project development report : demonstration project, park-and-ride lot at Cumberland Avenue and the Kennedy Expressway on the O'Hare rapid transit line.
Category: local document
By: Chicago Ill
Published: 1989
Call #: Cc T79 1989b
Language: English
-
7. Some effects of ramp metering on the street network in the Eisenhower Expressway corridor
Category: book
By: Illinois
Published: 1972
Call #: Il H63 1972a
Language: English
-
8. Final environmental statement for the Franklin Street connector, Dan Ryan Expressway to Wacker Drive
Category: local document
By: Chicago Ill
Published: 1972
Call #: Cc E59 1972
Language: English
1-8 of 8 Matches
Traffic engineering